12.07.2015 Views

Gerald McEniry - drbfconferences.org

Gerald McEniry - drbfconferences.org

Gerald McEniry - drbfconferences.org

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2013Update of DRBs in Canada<strong>Gerald</strong> <strong>McEniry</strong>, Eng., M.A.Sc.. M.Eng.Senior Consultant, Revay and Associates Limited, Montreal, Quebec,© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


Current DRBs in Canada (2013)H-Q Romaine, I II (2)Vancouver (1)Toronto (9-10)© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 2


Current DRBs in Canada – Port Mann WaterSupply Tunnel (Vancouver) 2011-20141 km EPB tunnel, 2 shafts, $150 million – Aecon, McNally© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 3


Toronto YorkSpadina Extension(2011-2015)Ø Two tunnel contractsØFour station contracts© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 4


Contract Contractor Award Date ContractSubstantialPerformanceDateSheppard West Stationand the Southern TunnelsHwy 407 Station and theNorthern TunnelsAecon, McNally,KiewitNovember 2010 2015OHL, FCC January 2011 2015Finch West Station Bondfield April 2011 2015York University Station 2015Steeles West Station Walsh September 2011 2015Vaughan CorporateCentre StationCarillion June 2011 2015© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 8


© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


Aecon holds the $279 millioncontract with partners, McNallyConstruction and KiewitConstruction, who will excavatethe twin 2.6 km (1.7 mile) tunnelsusing two of the four machinesThe second $404.5 milliontunneling contract is held by theSpanish firms of OHL & FCC whowill excavate the 6 km (3.7 mile)of tunnels using the remainingtwo machinesOne of four LOVAT EPBMs provided by the TTC© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl.


Metrolinx Crosstown LRT – TorontoObayashi, Kenny Construction© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 15


Current DRB –Eglington Crosstown LRT – Toronto© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 16


Current DRB – Metrolinx TorontoFirst EPBM that will excavate Crosstown tunnels in Toronto under construction in theCaterpillar factory (photos from Tunnel Talk)© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 17


Current DRBs in CanadaSouthEast Collector Trunk Sewer Tunnel, YorkRegion, Toronto, Ontario (2011-2014)South eastCollector(3.6 m diam., 15 km long), $290 million – Strabag Inc.© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 18


Current DRBHanlan Water Project – TorontoThe Hanlan Water Project inMississauga Ont. includes theinstallation of:Ø A 14.5 kilometer - 2.4 metresdiameter feedermainØ A 6 km long 1,5m diameterwatermainØ Tunnel and open cutexcavation (work hasstarted)© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 19


Hydro-Québec Romaine Project© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 20


Concreting of Hydro-Quebec’sRomaine II PowerhouseTwo Turbines – 320 MW eachPowerhouse – 103m x 52m x 88m© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 21


Concreting of Hydro-Quebec’sRomaine II PowerhouseConstruction of twogroups and service area(May 12, 2012)© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 22


Concreting of Hydro-Quebec’sRomaine II Powerhouse© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 23


Disputes and Procedures• Number of Disputes ?• Advisory Opinions• Formal Hearings© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 24


Promoting and Training for DRBsDRB PresentationsØ Owners, contractor associationsUpcoming DRB TrainingØ Hydro-Québec (Oct 2013)• Introduction and Administration (Owner, Contractor, DRBpanel)• Chairing (DRB Panel)• Toronto – annual meeting (Sep 2014)© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 25


ConclusionUpdate of DRBs in Canada 2013-2014Summary:Ø 12-13 DRBs in CanadaØ 9-10 in Toronto,Ø 1 in Vancouver,Ø 2 in Québec© <strong>Gerald</strong> <strong>McEniry</strong>DRBF Conference - September 2013 Miami , Fl. 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!