12.07.2015 Views

riprap waterway in curb cut - Central Federal Lands Highway Division

riprap waterway in curb cut - Central Federal Lands Highway Division

riprap waterway in curb cut - Central Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General InformationNOTES TO THE DESIGNERLast Updated: March 20091. Riprap classes. Use this draw<strong>in</strong>g with either the FP-03 <strong>riprap</strong> classificationsor the NCHRP classifications (See the Section 251 SCRs on the LOS).Applicable SCRs1. Section 251:http://www.cflhd.gov/design/_documents/construction/scr_03/S251-03E.doc2. Section 705:http://www.cflhd.gov/design/_documents/construction/scr_03/S705-03E.docTypical Pay Items Used• 60801-0600 Paved <strong>waterway</strong>, type 6 (SQYD) or• 60802-0600 Paved <strong>waterway</strong>, type 6 (LNFT)• Other project-specific items, <strong>in</strong>clud<strong>in</strong>g <strong>curb</strong> and pavement surfac<strong>in</strong>g• Geotextile quantity is shown for <strong>in</strong>formation onlyUpdatesOctober 16, 2000• Updated border to FLH StandardFebruary 28, 2005• Updated to MicroStation V8March 2009• Added note 3• M<strong>in</strong>or draft<strong>in</strong>g editsDesigner Notes for CFLHD Detail Draw<strong>in</strong>g C608-50


REGSTATEPROJECTSHEETNO.TOTALSHEETS*U.S. DEPARTMENT OF TRANSPORTATIONFEDERAL HIGHWAY ADMINISTRATIONCENTRAL FEDERAL LANDS HIGHWAY DIVISIONMETRIC DETAILRIPRAP WATERWAYIN CURB CUTDETAIL APPROVED FOR USE 07/2004REVISED: 08/2006 03/2009DETAILCM608-50


General InformationNOTES TO THE DESIGNERLast Updated: March 20091. Riprap classes. Use this draw<strong>in</strong>g with either the FP-03 <strong>riprap</strong> classificationsor the NCHRP classifications (See the Section 251 SCRs on the LOS).Applicable SCRs1. Section 251:http://www.cflhd.gov/design/_documents/construction/scr_03/S251-03M.doc2. Section 705:http://www.cflhd.gov/design/_documents/construction/scr_03/S705-03M.docTypical Pay Items Used• 60801-0600 Paved <strong>waterway</strong>, type 6 (m2) or• 60802-0600 Paved <strong>waterway</strong>, type 6 (m)• Other project-specific items, <strong>in</strong>clud<strong>in</strong>g <strong>curb</strong> and pavement surfac<strong>in</strong>g• Geotextile quantity is shown for <strong>in</strong>formation onlyUpdatesOctober 16, 2000• Updated border to FLH StandardFebruary 28, 2005• Updated to MicroStation V8March 2009• Added note 3• M<strong>in</strong>or draft<strong>in</strong>g editsDesigner Notes for CFLHD Detail Draw<strong>in</strong>g CM608-50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!