Optimized Construction PeriodProject Schedule for an APR1400Y+0 Y+1 Y+2 Y+3 Y+4 Y+5 Y+6 Y+7Y+8Pre-project WorkLicens<strong>in</strong>gSite Data ReviewDetailed Site InvestigationER PreparationER ReviewEng<strong>in</strong>eer<strong>in</strong>gProcurementPSAR PreparationPSAR ReviewPlant Design, Spec. & Draw<strong>in</strong>g IssueDesign Manufactur<strong>in</strong>g, DeliveryTarget Schedule48 monthsFOAKE Project Schedule(from F/C to COD)58 monthsConstruction &Commission<strong>in</strong>gSite PreparationF/C Set R/V CHT F/LCODExcavation