Nuclear Power Plants in Korea
Nuclear Power Plants in Korea Nuclear Power Plants in Korea
Development of OPR1000 (Optimized Power Reactor 1000)• Strategy of Design Improvement– Enhance safety level over the previous units– Improve plant operability and maintainability– Enhance constructability by Implementing area completion concept• Construction Period of OPR1000– First concrete to fuel loading: 46 months– First concrete to commercial operation: 52 months
Development of APR1400 (Advanced Power Reactor 1000)• APR1400 Development– Project period : ’92.12 ~ ’01.12 (9 yrs)• Advanced Design Features (ADFs) Implemented– Severe accident mitigation– In-Containment Refueling Water Storage Tank design– Quadrant divisional separation– Advanced Man-Machine Interface System (MMIS) implementation• Construction Period of APR1400– First concrete to fuel loading: 42 months– First concrete to commercial operation: 48 months
- Page 1 and 2: Competitiveness ofKorean Nuclear Po
- Page 3 and 4: Chapter1Status of Korean Nuclear Po
- Page 5 and 6: Chapter2Korean Nuclear Industry
- Page 7 and 8: Project Management & OperationKorea
- Page 9 and 10: Average capacity factor of Korean n
- Page 11 and 12: Comparison of Outage DurationSource
- Page 13: Qualification of Manpower• Profes
- Page 17 and 18: Doosan Role in Korea Nuclear Progra
- Page 19 and 20: Nuclear Shops(1) 800 tons Over Head
- Page 21 and 22: Long Lead Manufacturing Schedule201
- Page 23 and 24: Nuclear Fuel Supply in KoreaPWR Cap
- Page 25 and 26: Nuclear Fuel Features (New)• Top
- Page 27 and 28: Maintenance & ServicesKorea Plant S
- Page 29 and 30: DAEWOO E&C’s Comprehensive Constr
- Page 31 and 32: DAEWOO E&C’s Nuclear ExperienceWo
- Page 33 and 34: DAEWOO E&C’s Nuclear ExperienceSh
- Page 35 and 36: DAEWOO E&C’s Nuclear ExperienceLu
- Page 37 and 38: DAEWOO E&C’s Nuclear ExperienceLo
- Page 39 and 40: Plentiful Construction ExperiencesC
- Page 41 and 42: Cost CompetitivenessUnit Generation
- Page 43 and 44: World-Class Operation PerformanceOu
- Page 45 and 46: Excellent Human ResourcesConstructi
- Page 47 and 48: Robust Supply ChainDesign & Enginee
Development of OPR1000 (Optimized <strong>Power</strong> Reactor 1000)• Strategy of Design Improvement– Enhance safety level over the previous units– Improve plant operability and ma<strong>in</strong>ta<strong>in</strong>ability– Enhance constructability by Implement<strong>in</strong>g area completion concept• Construction Period of OPR1000– First concrete to fuel load<strong>in</strong>g: 46 months– First concrete to commercial operation: 52 months