Marine Produce Australia: Cone Bay Barramundi Aquaculture ...
Marine Produce Australia: Cone Bay Barramundi Aquaculture ...
Marine Produce Australia: Cone Bay Barramundi Aquaculture ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Key Management Action Target/Objective<br />
During the development of the EMMP,<br />
the proponent shall regularly monitor<br />
sediment and/or water column for the<br />
following parameters: chlorophyll-a<br />
concentration; light attenuation coefficient;<br />
dissolved nutrients; dissolved<br />
oxygen and redox discontinuity, to<br />
determine whether the interim EQGs are<br />
being achieved.<br />
The proponent shall meet the following<br />
Proponents Commitment’s as provided in<br />
the PER, and summarized in EPA<br />
Report 1035:<br />
Prepare a water quality management<br />
program as part of the EMMP;<br />
Prepare a benthic quality management<br />
program as part of the EMMP;<br />
Prepare a mangrove management<br />
program as part of the EMMP;<br />
Prepare a coral management program as<br />
part of the EMMP.<br />
In the event that a guideline “trigger”<br />
level referred to in condition 5-3 is<br />
exceeded, the proponent shall report the<br />
matter to the Department of<br />
Environment and Conservation1 within<br />
one working day of determining that this<br />
has occurred, and the proponent shall:<br />
initiate an investigation against the EQS<br />
into the cause of the exceedance in<br />
accordance with the framework<br />
developed in the State Water Quality<br />
Management Strategy No. 6:<br />
Implementation Framework for Western<br />
<strong>Australia</strong> for the <strong>Australia</strong>n and New<br />
Zealand Guidelines for Fresh and <strong>Marine</strong><br />
Water Quality and Water Quality<br />
Monitoring and Reporting (Government<br />
of Western <strong>Australia</strong>, Report no. SWQ6),<br />
to the requirements of the Department of<br />
Environment and Conservation and the<br />
Department of Fisheries; and<br />
Specify required timeframes for<br />
determining and subsequently remedying<br />
the source of exceedance.<br />
In the event that an environmental<br />
quality standard referred to in<br />
condition 5-2 is exceeded, the proponent<br />
shall report the matter to the<br />
Department of Environment and<br />
Conservation1 within one working day of<br />
determining that this has occurred, the<br />
proponent shall:<br />
initiate a management response to<br />
determine the source and remedy the<br />
exceedance in accordance with the<br />
implementation framework for the<br />
National Water Quality Management<br />
Strategy, to the requirements of the<br />
Department of Environment and<br />
Conservation and the Department of<br />
Fisheries; and<br />
Specify required timeframes for<br />
determining and subsequently remedying<br />
the source of exceedance.<br />
Notes:<br />
1. Now the Office of the EPA.<br />
To fulfil Condition 5-3<br />
of Ministerial<br />
Statement 798.<br />
To fulfill the Proponent’s<br />
commitments outlined<br />
in the PER and summarised<br />
in the EPA<br />
Report 1305.<br />
To fulfill Condition 5-4<br />
of Ministerial<br />
Statement 798.<br />
To fulfill Condition 5-5<br />
of Ministerial<br />
Statement 798.<br />
OEPA<br />
reporting/evidence<br />
Annual compliance<br />
report (as<br />
appropriate).<br />
Laboratory test results.<br />
EMMP prepared and<br />
implemented to the<br />
requirements of DEC1<br />
and DoF. It is noted<br />
that the mangrove<br />
management plan is no<br />
longer required (OEPA<br />
advice in the Scoping<br />
Guidelines)<br />
Annual compliance<br />
report<br />
(as appropriate).<br />
Annual compliance<br />
report<br />
(as appropriate).<br />
Status<br />
Oceanica: <strong>Marine</strong> <strong>Produce</strong> <strong>Australia</strong>: <strong>Cone</strong> <strong>Bay</strong> <strong>Barramundi</strong> <strong>Aquaculture</strong>, Environmental Monitoring & Management Plan 3