28.11.2012 Views

Marine Produce Australia: Cone Bay Barramundi Aquaculture ...

Marine Produce Australia: Cone Bay Barramundi Aquaculture ...

Marine Produce Australia: Cone Bay Barramundi Aquaculture ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 1.1 Environmental Values and Environmental Quality Objectives to be applied in<br />

Western <strong>Australia</strong>’s coastal waters<br />

Environmental Value Environmental Quality Objective<br />

Ecosystem Health EQO1 Maintenance of ecosystem integrity<br />

Fishing and <strong>Aquaculture</strong><br />

Recreation and Aesthetics<br />

Industrial Water Supply<br />

EQO2 (i) Maintenance of aquatic life for human consumption<br />

EQO2 (ii) Maintenance of aquaculture<br />

EQO3 Maintenance of primary contact recreation values<br />

EQO4 Maintenance of secondary contact recreation values<br />

EQO5 Maintenance of aesthetic values<br />

EQO6 Maintenance of water suitable for industry use<br />

The environmental requirements for EQO1 vary according to the level of ecological protection<br />

assigned to an area (as per EPA 2005a). Three levels of ecological protection are relevant to<br />

this EMMP (Table 1.2).<br />

Table 1.2 Levels of Ecological Protection for EQO 1: Maintenance of Ecosystem Integrity<br />

Level of Ecological<br />

Protection<br />

Contaminant concentration<br />

indicators<br />

Limit of acceptable change<br />

Maximum Protection No contaminants - pristine No detectable changes from natural variation<br />

High protection Very low levels of contaminants Some small changes from natural variation<br />

Moderate protection Elevated levels of contaminants Moderate changes from natural variation<br />

Environmental quality is assessed and managed based on two types of Environmental Quality<br />

Criteria (EQC): Environmental Quality Guidelines (EQG) and Environmental Quality<br />

Standards (EQS). If an EQG is exceeded there is uncertainty that the EQO is met, and this<br />

triggers further assessment against the EQS: if the EQS is also exceeded then the level of<br />

risk is considered unacceptable and management is triggered (refer also to Section 3.3).<br />

1.2 Implementation strategy<br />

The EMMP provides details of the type and extent of environmental monitoring to be<br />

undertaken, and outlines the management responses should the EQS be triggered. The<br />

results of the monitoring program, including the extent to which the EQC have been met, will<br />

be reported in the Annual Compliance Reports.<br />

Underpinning the EMMP is a requirement to meet the Proponent’s Commitments (PER 2007)<br />

and Conditions 5-1 to 5-5 of Ministerial Statement 798 (Appendix A). Table 1.3 provides<br />

details of these Conditions and Commitments and indicates the steps to be taken by the<br />

Proponent to ensure they’re met.<br />

Table 1.3 Proponent’s key management actions, targets and objectives and the evidence to be<br />

provided<br />

Key Management Action Target/Objective<br />

The Proponent shall submit to the CEO of<br />

the Department of Environment and<br />

Conservation1 Annual Compliance<br />

Reports annually reporting on the<br />

previous twelve months<br />

Prior to stocking on pens, the Proponent<br />

shall prepare and commence implementation<br />

of the EMMP to the requirements<br />

of the DEC1 and DoF<br />

The EMMP required by condition 5-1 shall<br />

include the monitoring of specific<br />

parameters within the water column and<br />

sediment as Environmental Quality<br />

Guidelines (EQG) indicators; set out the<br />

process for the development and<br />

application of Environmental Quality<br />

Standards (EQS) within three years, and<br />

specify the format for annual reporting of<br />

monitoring results.<br />

To fulfill Condition 4-1<br />

of Ministerial<br />

Statement 798.<br />

To fulfill Condition 5-1<br />

of Ministerial<br />

Statement 798.<br />

To develop an appropriate<br />

EMMP including a series of<br />

indicators and triggers,<br />

exceedance of which will<br />

require management and<br />

where necessary,<br />

restoration of<br />

environmental quality to<br />

comply with the specified<br />

level of ecological<br />

protection.<br />

OEPA<br />

reporting/evidence<br />

EMMP prepared and<br />

implemented to the<br />

requirements of DEC1<br />

and Department of<br />

Fisheries (DoF)<br />

EMMP prepared and<br />

implemented to the<br />

requirements of DEC1<br />

and DoF<br />

EMMP prepared and<br />

implemented to the<br />

requirements of DEC1<br />

and DoF.<br />

Annual compliance<br />

report (as<br />

appropriate).<br />

Laboratory test results.<br />

Status<br />

2 Oceanica: <strong>Marine</strong> <strong>Produce</strong> <strong>Australia</strong>: <strong>Cone</strong> <strong>Bay</strong> <strong>Barramundi</strong> <strong>Aquaculture</strong>, Environmental Monitoring & Management Plan

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!