-Seminar and Technology Match Make EventbyGovernment of the Netherlands100 kW CC-<strong>OTEC</strong> <strong>Plant</strong> and DeepOcean water Applicationsin Kumejima, <strong>Okinawa</strong>, JapanHawai’i Convention CenterHonolulu, HAWAI’I,USASeptember 10, 2013Yasuyuki <strong>Ikegami</strong>Institute of Ocean Energy, Saga University(IOES), JAPANKatsuya FurugenDepartment of Commerce, Industry and Labor<strong>Okinawa</strong> Prefectural Government


<strong>OTEC</strong> Demonstration Facility in Kumejima(<strong>Okinawa</strong>)<strong>Okinawa</strong> Prefectural Deep Sea WaterResearch Center, since 2000<strong>OTEC</strong> DemonstrationFacility(Picture on 10 March. 2013)


Go to NEW STAGE (ReSTART) ofReal <strong>OTEC</strong> Technology toconnect the electric gridfor the first time in 15 yearsin the world.


IOES (Institute of Ocean Energy, Saga Univ.)30 kWElectricityDesalinationH2 StorageLithium RecoveryExperiments and Demonstrationby IOES (Institute of OceanEnergy, Saga University)


NEDO Renewable Energy TechnologyWhite Paper (outline)~ Toward a new, energy-diversified society ~July 2010New Energy and Industrial Technology DevelopmentOrganization (NEDO)JAPAN


7. <strong>OTEC</strong> ~Technology Roadmap~


Power Demands in <strong>Okinawa</strong><strong>Okinawa</strong> MainlandPopulation:approx.1.25mil.Total Capacity of ExistingPower <strong>Plant</strong>:1733MWKumejimaPopulation:approx.9thou.Total Capacity of ExistingPower <strong>Plant</strong>:19.2MWMiyakojimaPopulation:approx.50thou.Total Capacity of ExistingPower <strong>Plant</strong>:76.5MWIshigakijimaPopulation:approx.45thou.Total Capacity of ExistingPower <strong>Plant</strong>:69MWKuroshio Current AreaChichijimaPopulation:approx.2 thou.Total Capacity of ExistingPower <strong>Plant</strong>:4.3MWMinamitorishima(Out of this map:24 o 17’N 153 o 59E)OkinotorishimaREFERENCE:NEDO「 海 洋 エネルギーポテンシャルの 把 握 に 係 る 業 務 」( 平 成 23 年 3 月 )における 温 度 差 分布 図 (5 年 間 平 均 値 )に 追 記8


Implementation System of <strong>Okinawa</strong>’s <strong>OTEC</strong>Demonstration Project<strong>Okinawa</strong> pref. GovCommissionCooperationInstitute of Ocean Energy,Saga UniversityCooperationIHI <strong>Plant</strong> Construction, Xenesys, Yokogawa Electric (JV)Main role○ IHI <strong>Plant</strong> Construction○ Xenesys○ Yokogawa ElectricProduce & set up sea water systemDesign, work・・・etcBasic conceptProduce & set up generation unit & heat exchangerExamine multiple usage of DSW ・・・etcProduce & set up electricity & control system・・・etc


100kW <strong>OTEC</strong> Demonstration Facility in Kumejima(<strong>Okinawa</strong>) Power Generation UnitUnit A forContinuous PowerGeneration(max.50kW)Unit B forExperiments onElemental Technology(50kW size withoutTurbine Generator)>Working Fluid: R134a>Thermo Cycle: Rankine(2-Stage Rankine when Unit-Aand B are combined)>Evaporator and Condenser:Titanium Plate HEX (Cross Flow)>Turbine Generator (Unit-A):50kW, 400V, 33000rpm withfrequency conditionerEvaporator AEvaporator BMonitoringand ControlSpaceCondenser BCondenser A


<strong>OTEC</strong> Demonstration Facility in Kumejima(<strong>Okinawa</strong>) Recent Mile StonesJan. 2013 Feb. 2013 Mar. 2013 Apr. 2013 May. 2013June,201328 Jan.ConstructionStarted at Site30 Mar. / 1st Power Generation Test Succeeded16 June.OfficialOperationStartsSurface Water:Deep Water:Power Output:23.5 o C, 330t/h9.3 o C, 250t/h3.1kW (for Test)


AquacultureUsing DOW‘TAKUMI’ Project拓 海Recycling Mineral RichDeep Ocean Water(by Prof. Ouchi)


<strong>Marine</strong> Forum 21 Project


TAKUMI in Final Docking Before Deliveryin IHI Yokohama Shipyard, May 2003海 洋 肥 沃 化 装 置 「 拓 海 」の 開 発 と 実 海 域 実 験海 洋 肥 沃 化 装 置 「 拓 海 」の 設 計 ・ 製 作 ・ 設 置 ・ 運 用 について㈱ 大 内 海 洋 コンサルタント 大 内 一 之㈱ 大 内 海 洋 コンサルタント大 内 一 之


TAKUMI on Operation at Sagami Bay(by Prof. Ouchi, The University of Tokyo )


Nippon Kaiji Kyokai (known as ClassNK) has issued its firstApproval-in-Principle (AIP) for Totally Submerged <strong>OTEC</strong>floating power plant model of JMU(Japan <strong>Marine</strong> United Corp.)On September 2 nd ,201316


Fukushima Wind Farm Project17


Nippon Kaiji Kyokai (known as ClassNK) has issued its firstApproval-in-Principle (AIP) for Totally Submerged <strong>OTEC</strong>floating power plant model of JMU(Japan <strong>Marine</strong> United Corp.)On September 2 nd ,201319