12.07.2015 Views

TURBOmax VUW 282 E - Heatingspares247.com

TURBOmax VUW 282 E - Heatingspares247.com

TURBOmax VUW 282 E - Heatingspares247.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.3 Gas supplyThe gas supplier should ensure theavailability of an adequate supply ofgas.A gas meter may only be connectedto the service pipe by the supplier ofgas or their contractor.An existing meter should be checkedto ensure that it is capable of passingthe rate of gas supply required.Installation pipes should be fitted inaccordance with BS 6891.Pipework from the meter to the boilermust be of an adequate size. Do notuse pipes of a smaller size than theboiler gas connection (15mm).The complete installation must betested for soundness and purged asdescribed in BS 6891.3.4 Flue systemThe standard horizontal flue system(Art. No. 300 807) is suitable forinstallations up to 995 mm measuredfrom the centre of the boiler flue outletto the outside face of the wall (A, fig.4). Flue extensions (Art. No. 300 802)are available to extend this length upto 2965 mm. Both 90° elbows(Art. No. 300 808) and 45° bends(Art. No. 300 809) are also availableto increase siting flexibility.A vertical flue system is also available(Art. No. 300 800).<strong>TURBOmax</strong> boilers may also be usedin SE- duct applications (SE- duct fluesystem available Art. No. 300810)Refer to the flue installation instructionsfor full details.fig. 4GW 579/08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!