Sheet B Check main on/off control, overheat Thermostat and anti-surge fuseIs 230 V present across boilerterminals 3 and 5YesDoes green power ’on’ indicator ( )glow now?No NoBoiler on/off control defective,replace main switchboardCheck, replace 1,25 A fuse next tothe boiler terminal strip (spare fuseprovided with the appliance).Reset overheat cut-off device bypressing on the middle of thetransparent rubber cover.Does green indicator now glow?NoCheck continuity of overheatthermostat, replace if necessary.Does green indicator now glow?Replace main switchboardNoNoCheck transformer (A, fig. 67):230 V AC primary (black/grey) andapprox 17 V AC secondary (blue/brown)Does green indicator now glow?YesYesYesYesGo to sheet C46
Sheet C Check Central Heating control and external controlsDoes yellow central heating demand indicator ( ) glow? Does burner light?Go to Sheet HYesYesNoNoCheck central heating control switch is set to position ( )Go to Sheet DIs 230 V AC present across boilerterminals 4 and 5?YesNoExternal fault. Check whether all external controls arecalling for heat, replace or repair as necessary(see also note 1, sheet A)If the yellow central heating demand indicator ( )still does not glow, replace main switchboard47
- Page 1 and 2: INSTRUCTIONS FOR INSTALLATION AND S
- Page 3 and 4: 1. Introduction Note: This boiler m
- Page 5 and 6: 2.2 Dimensions(All dimensions in mm
- Page 7 and 8: 3. General requirements 3.1 Related
- Page 9 and 10: 3.4.1 Flue Termination1. The termin
- Page 11 and 12: 3.7.2 Filling and make upThe system
- Page 13 and 14: 4. Boiler installationsequence4.1 G
- Page 15 and 16: 4.3.2 Using the boiler template(fig
- Page 17 and 18: 4.5.3.4 Gas supplyThe boiler is sup
- Page 19 and 20: Drill two holes 3 mm diameterthroug
- Page 21 and 22: 4.8.3 Thermostatic radiator valvesT
- Page 23 and 24: 5.4 Filling the heating systemThe b
- Page 25 and 26: At this point the preset maximumdom
- Page 27 and 28: 5.10 Functional Checks5.10.1 Introd
- Page 29 and 30: 5.14 Hand over to userSet the maxim
- Page 31 and 32: 6.2.5 Inspect burnerWith the combus
- Page 33 and 34: 7.1.3 Removal of front casing7.1.3.
- Page 35 and 36: 7.4 Replacement of burner• Isolat
- Page 37 and 38: 7.7.1 Replacement of main solenoidv
- Page 39 and 40: 7.10 Replacement oftransformer• I
- Page 41 and 42: 7.15.1 Replacement of water section
- Page 43 and 44: 7.20 Removal of printed circuitboar
- Page 45: Sheet A Check electrical supply and
- Page 49 and 50: Sheet E Check fan/flue gas systemDo
- Page 51 and 52: Sheet G Check ignition system and g
- Page 53 and 54: Sheet J Check D.H.W. OperationDraw
- Page 55 and 56: 9.2 Wiring diagram: VUW 242 E / 282
- Page 57 and 58: 10. Short parts list Key No. Descri
- Page 59 and 60: 11. Supplementaryinformation forTUR
Sheet C Check Central Heating control and external controlsDoes yellow central heating demand indicator ( ) glow? Does burner light?Go to Sheet HYesYesNoNoCheck central heating control switch is set to position ( )Go to Sheet DIs 230 V AC present across boilerterminals 4 and 5?YesNoExternal fault. Check whether all external controls arecalling for heat, replace or repair as necessary(see also note 1, sheet A)If the yellow central heating demand indicator ( )still does not glow, replace main switchboard47