12.07.2015 Views

TURBOmax VUW 282 E - Heatingspares247.com

TURBOmax VUW 282 E - Heatingspares247.com

TURBOmax VUW 282 E - Heatingspares247.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7.20 Removal of printed circuitboards (PCBs)Before commencing work on PCBreplacements carry out the following:-• Diagnose which board requireschanging using the fault findingguide (see section 8: Fault finding).• Turn off the boiler as in section7.1.1.• Remove front casing as in section7.1.3.• Lower from control panel as insection 7.1.6.• Remove back of control box byundoing the 3 screws (1 and 2,fig. 65).7.20.1 Replacement of mainswitchboard• Disconnect external wiring fromboiler terminal strip.• Unplug 2 ribbon cables fromcontrol board (2, fig. 75).• Unplug all leads from the mainswitchboard.(1, fig. 75) and liftswitchboard carefully out of controlbox.• Reassemble in reverse order.Note: When refitting the mainswitchboard ensure that the on/offcontrol knob spindle (3, fig. 75)engages correctly into the on/offswitch (5, fig. 75) mounted on theboard.• Carry out electrical checks (seesection 5.1)fig. 75GW 615/07.20.2 Replacement of control board• Unplug 2 ribbon cables fromcontrol board (2, fig. 76).• Push four spring retaining clips(5, fig. 76) out, and gently liftcontrol board out of control box.• Reassemble in reverse order.Note: When refitting the controlboard, ensure that the user controlspindles (a, fig. 75) are aligned withthe potentiometer and control switchholes (b, fig. 75) and that the locatingrib of the potentiometer/switchcorrectly engages in the groove of thecontrol knob spindle.• Carry out electrical checks(see section 5.1)fig. 76GW 617/043

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!