12.07.2015 Views

Islamic Republic of Afghanistan - Enhanced Integrated Framework ...

Islamic Republic of Afghanistan - Enhanced Integrated Framework ...

Islamic Republic of Afghanistan - Enhanced Integrated Framework ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PILLAR : INFRASTRUCTURESECTOR : MINES AND NATURAL RESOURCESObjectives or Outcomes Policy Actions or Activities Category Time frame Responsible AgencyIncreased Private SectorInvestment in mining sectorIssuance <strong>of</strong> permit to Private Sector who work on underground water Development TBD MoMRehabilitation and establishment <strong>of</strong> new Hydrological Stations for collection<strong>of</strong> the necessary information and figuresDevelopment Continued MoMEnhancement <strong>of</strong> working relationships with related line ministries for water Development Continued MoMDesign and implementation <strong>of</strong> Mineral policy Legislation 2008-2013 MoMPreparation <strong>of</strong> Gas Law and Manual Legislation End 2009 MoMAnalysis study <strong>of</strong> loss and damages in mines extraction Development Continued MoMCategorizing oil and gas fields to gas blocks for better management Development Continued MoMLeasing <strong>of</strong> oil and gas blocks to privates sector for research and study Development Continued MoMEstablishment <strong>of</strong> new organizational structure for gas and oil management Institution Building End 2008 MoMPublic access to natural gas Design <strong>of</strong> plan for gas pipeline grid to provinces Development Continued MoMStrong regulatory frameworkin placePRR Implementation Institution Building End 2009 MoMCapacity building <strong>of</strong> Survey and Geological staff Institution Building Continued MoMEquipping labs <strong>of</strong> GSD Institution Building First Phase will be doneby 2008 and then ContinuedStandardizing working a capacity <strong>of</strong> Geology staff Institution Building Continued MoMCoordination with different countries in raising capacity <strong>of</strong> the public sector Institution Building Continued MoMIntroduction <strong>of</strong> measures to ensure environmental concerns taken care <strong>of</strong>.Conservation <strong>of</strong> Biodiversity in implementing mining projectsPromotion <strong>of</strong> regional cooperation to facilitate various projects under themining sectorTo mainstream into all administrative reform programs measures required toaddress the systems and incentives promoting anti-corruption within the publicadministration system and Development Activities.To maintain the highest level <strong>of</strong> transparency, accountability and integrity inthe relationship between the public and private sector.Gender mainstreaming in the policies in the mining sector.Priority to areas having substantial narcotics cultivation to promote economicactivity to generate alternate livelihoodsInstitution Building/ Env.Cross Cutting IssuesDevelopment/ Env. CrossCutting IssuesDevelopment/ RC CrossCutting IssuesInstitution Building / ACCross Cutting IssuesInstitution Building / ACCross Cutting IssuesDevelopment/ GenderCross Cutting IssuesDevelopment/ CN CrossCutting IssuesContinuedContinuedContinuedContinuedContinuedMoMMoMMoMMoMMoMMoM2008-2013 MoM2008-2010 MoM220<strong>Afghanistan</strong> National Development Strategy (ANDS)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!