- Page 1 and 2: Phase II: The Challenge of Low-Carb
- Page 3 and 4: CLIMATE CHANGE AND THE WORLD BANK G
- Page 5 and 6: Table of ContentsAbbreviations . .
- Page 7 and 8: Figures1.1 GHG Emissions by Sector
- Page 9 and 10: AcknowledgmentsThe report was prepa
- Page 11 and 12: Executive SummaryUnabated, climate
- Page 13 and 14: esettlement plans has been ineffect
- Page 15 and 16: of some technologies, such as landf
- Page 17 and 18: Scale up high-impact investmentsEne
- Page 19 and 20: should have been strengthened in th
- Page 21 and 22: Major monitorable IEGrecommendation
- Page 23 and 24: Major monitorable IEGrecommendation
- Page 25 and 26: Chairman’s Summary: Committee onD
- Page 27 and 28: most places. Before we get there, w
- Page 29 and 30: non-Annex I countries. The World Ba
- Page 31 and 32: attention. In a couple of decades,
- Page 33 and 34: GlossaryAdditionalityBankabilityBas
- Page 35: Joint ImplementationA mechanism und
- Page 39 and 40: of interventions, from technical as
- Page 41 and 42: would allow industrialized countrie
- Page 43 and 44: growth, poverty reduction (includin
- Page 45 and 46: Table 1.1 Map of the EvaluationSect
- Page 47 and 48: Chapter 2eValuaTION HIGHlIGHTS• W
- Page 49 and 50: Table 2.2Evaluated World Bank Renew
- Page 51 and 52: Figure 2.2Breakdown of 2003-08 Low-
- Page 53 and 54: Table 2.4 Commitments to Grid-Conne
- Page 55 and 56: Box 2.1The Economics of Grid-Connec
- Page 57 and 58: on average (Iyadomi 2010). (Reducti
- Page 59 and 60: and industrial policy. An increasin
- Page 61 and 62: Table 2.6Hydropower Investments by
- Page 63 and 64: costs for remaining unelectrified a
- Page 65 and 66: World Bank experienceTwo factors ac
- Page 67: Box 2.5On-Grid and Off-Grid Renewab
- Page 70 and 71: Energy EfficiencyThe first phase in
- Page 72 and 73: Box 3.1ESCOs and Energy Performance
- Page 74 and 75: have had limited causal impact on t
- Page 76 and 77: measurement of achieved economic re
- Page 78 and 79: Since the early 1990s, public entit
- Page 80 and 81: part with a $198 million IDA credit
- Page 83 and 84: Chapter 4eVAluATioN HigHligHTS• B
- Page 85 and 86: The WBG urban transport portfolio (
- Page 87 and 88:
y conventional transport systems, i
- Page 89 and 90:
include the forest carbon projects
- Page 91 and 92:
for Costa Rica for the period 2000-
- Page 93 and 94:
After 20 years of effort, systemati
- Page 95 and 96:
orrowers have demonstrated the abil
- Page 97 and 98:
Chapter 5EVALuATioN HigHLigHTS• O
- Page 99 and 100:
Consequently, the efficiency with w
- Page 101 and 102:
technologies could accelerate diffu
- Page 103 and 104:
A second issue, inherent to any adv
- Page 105 and 106:
goal of promoting wind turbine impr
- Page 107 and 108:
ConclusionsThe WBG’s efforts to p
- Page 109 and 110:
Table 5.1Carbon Funds at the World
- Page 111 and 112:
demonstration initiative. The Commu
- Page 113 and 114:
Impacts on technology transferThe 2
- Page 115 and 116:
Chapter 6Photo by Martin Wright/Ash
- Page 117 and 118:
Figure 6.1800Economic and Carbon Re
- Page 119 and 120:
Specifically, the WBG could:• Pla
- Page 121 and 122:
Table 6.1Summary of Sectoral Findin
- Page 123 and 124:
Table 6.1Sector Intervention Direct
- Page 125 and 126:
Appendix ARenewable Energy Tables a
- Page 127 and 128:
Table A.4Grid-Based Biomass/Biogass
- Page 129 and 130:
Table A.5 (continued)Negative examp
- Page 131 and 132:
Figure A.4A. Hydro/biomass capacity
- Page 133 and 134:
Appendix bWorld Bank Experience wit
- Page 135 and 136:
Table C.2Completed Low-Carbon Energ
- Page 137 and 138:
TAble C.4Reviewed energy efficiency
- Page 139 and 140:
the new capacity. Transmission syst
- Page 141 and 142:
Table E.2Climate obligationsCoal Pl
- Page 143 and 144:
Table F.2GHG objectiveModeNumber of
- Page 145 and 146:
IEG eliminated a few cases of doubl
- Page 147 and 148:
Table H.1Project andlocationBioener
- Page 149 and 150:
Appendix ICarbon and Economic Retur
- Page 151 and 152:
Appendix JRecent WBG Developments i
- Page 153 and 154:
y providing value to standing fores
- Page 155 and 156:
never had an explicit corporate str
- Page 157 and 158:
overnight. The Bank can provide ass
- Page 159 and 160:
Chapter 51. From the chief economis
- Page 161 and 162:
Hartshorn, G., P. Ferraro, and B. S
- Page 163 and 164:
______. 2007. World Development Ind
- Page 165 and 166:
IEG PublicationsAnalyzing the Effec