12.07.2015 Views

direct testimony of the capital expenditures, reliability, and - nyseg

direct testimony of the capital expenditures, reliability, and - nyseg

direct testimony of the capital expenditures, reliability, and - nyseg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Case 09-E-____; Case 09-G-____ (NYSEG)DIRECT TESTIMONY OF THE CAPITAL EXPENDITURES,RELIABILITY, AND OPERATIONS PANEL12345678910111213141516171819Q. Are you proposing to add any additional field positions to <strong>the</strong> NYSEG electricmeter technician positions?A. Yes. There are currently 35 electric meter technicians working in <strong>the</strong> 13 NYSEGDivision <strong>of</strong>fices. Given <strong>the</strong> onset <strong>of</strong> new technology for electric metering (e.g.,time based rates, Smart Grid), NYSEG is proposing to create a small, mobilegroup <strong>of</strong> approximately four (4) experienced meter technician positions. Thesemeter technicians would be an extension <strong>of</strong> <strong>the</strong> Corporate Meter Lab <strong>and</strong> wouldreport <strong>direct</strong>ly to <strong>the</strong> meter engineer. They would be responsible for providingtraining <strong>and</strong> support to <strong>the</strong> rest <strong>of</strong> <strong>the</strong> meter technicians. Their expertise would bein high volume metering, particularly <strong>the</strong> Interchange Point metering. This groupwould be mobilized for special project work as well.Q. Are you proposing to add positions at any <strong>of</strong> <strong>the</strong> o<strong>the</strong>r departments within MeterServices?A. No. The existing position levels in <strong>the</strong> remaining departments are adequate <strong>and</strong>should be maintained at <strong>the</strong> current levels.Q. What is <strong>the</strong> estimated incremental cost <strong>of</strong> <strong>the</strong>se positions?A. The incremental annual cost is $92,400 for gas <strong>and</strong> $575,000 for electric.Q. Does this complete <strong>the</strong> Panel’s <strong>direct</strong> <strong>testimony</strong> at this time?A. Yes.93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!