direct testimony of the capital expenditures, reliability, and - nyseg
direct testimony of the capital expenditures, reliability, and - nyseg direct testimony of the capital expenditures, reliability, and - nyseg
Case 09-E-____; Case 09-G-____ (NYSEG)DIRECT TESTIMONY OF THE CAPITAL EXPENDITURES,RELIABILITY, AND OPERATIONS PANEL123456789101112131415161718192021Q. Can you please describe NYSEG's projects that are classified as TransmissionMains?A. These projects involve relocating or replacing NYSEG's gas transmissionfacilities including mains and cased crossings.Q. What NYSEG projects are classified as Distribution Mains?A. These projects include the leak prone main replacement program, extension ofmains to serve new customers, and the installation of new pipe required to supportorganic growth of existing distribution systems.Q. What is NYSEG's capital forecast for these projects based upon?A. NYSEG forecasts these expenditures based on the projected cost to replace 20miles of leak prone main, the known development projects such as commercialand industrial development, residential housing development, subdivisions andhistorical growth information. Expenditures for the leak prone main and leakprone service replacement programs are based upon historical leak information,risk factors, NYSEG's O&M procedures and the terms and conditions of theNYSEG mandated programs. Economic development driven projects are alsoincluded in distribution. The capital requirements for new business are generallydependent upon the economic conditions throughout the service territory. Eventhough the Company has been experiencing net negative load growth due toequipment efficiencies, a sluggish economy and fluctuating commodity cost, abaseline level of work continues.73
Case 09-E-____; Case 09-G-____ (NYSEG)DIRECT TESTIMONY OF THE CAPITAL EXPENDITURES,RELIABILITY, AND OPERATIONS PANEL1234567891011121314151617181920Q. Can you please describe NYSEG's projects that are classified as gas services?A. These projects include installation of services to new customers, upgrade ofservices to supply increased loads to existing customers as required and thereplacement of a minimum of 2,000 leak prone services as part of the leak proneservice replacement program.Q. What projects are included in the budget for those NYSEG projects that areclassified as gas meters and service regulators?A. The budget for gas meters includes new meters and regulators to serve newcustomers, upgraded meters for existing customers and the replacement of agingmeters identified through the alternative in test program ("AIP").Q. Can you please describe M&R/Gate Station and Distribution Regulator Stationprojects?A. The M&R/Gate Station and Distribution Regulator Station projects include thereplacement or addition of new gas facilities due to the particular condition or theneed to increase system capacity. Examples of these types of programs includeobsolete regulator replacements, station replacement programs, and odorizerreplacement programs. These facilities are critical components to the safety andreliability of the delivery system. Systematic replacement and upgrade programssimilar to the main and service replacement programs should also be included andfunded in the annual capital plan.74
- Page 23 and 24: Case 09-E-____; Case 09-G-____ (NYS
- Page 25 and 26: Case 09-E-____; Case 09-G-____ (NYS
- Page 27 and 28: Case 09-E-____; Case 09-G-____ (NYS
- Page 29 and 30: Case 09-E-____; Case 09-G-____ (NYS
- Page 31 and 32: Case 09-E-____; Case 09-G-____ (NYS
- Page 33 and 34: Case 09-E-____; Case 09-G-____ (NYS
- Page 35 and 36: Case 09-E-____; Case 09-G-____ (NYS
- Page 37 and 38: Case 09-E-____; Case 09-G-____ (NYS
- Page 39 and 40: Case 09-E-____; Case 09-G-____ (NYS
- Page 41 and 42: Case 09-E-____; Case 09-G-____ (NYS
- Page 43 and 44: Case 09-E-____; Case 09-G-____ (NYS
- Page 45 and 46: Case 09-E-____; Case 09-G-____ (NYS
- Page 47 and 48: Case 09-E-____; Case 09-G-____ (NYS
- Page 49 and 50: Case 09-E-____; Case 09-G-____ (NYS
- Page 51 and 52: Case 09-E-____; Case 09-G-____ (NYS
- Page 53 and 54: Case 09-E-____; Case 09-G-____ (NYS
- Page 55 and 56: Case 09-E-____; Case 09-G-____ (NYS
- Page 57 and 58: Case 09-E-____; Case 09-G-____ (NYS
- Page 59 and 60: Case 09-E-____; Case 09-G-____ (NYS
- Page 61 and 62: Case 09-E-____; Case 09-G-____ (NYS
- Page 63 and 64: Case 09-E-____; Case 09-G-____ (NYS
- Page 65 and 66: Case 09-E-____; Case 09-G-____ (NYS
- Page 67 and 68: Case 09-E-____; Case 09-G-____ (NYS
- Page 69 and 70: Case 09-E-____; Case 09-G-____ (NYS
- Page 71 and 72: Case 09-E-____; Case 09-G-____ (NYS
- Page 73: Case 09-E-____; Case 09-G-____ (NYS
- Page 77 and 78: Case 09-E-____; Case 09-G-____ (NYS
- Page 79 and 80: Case 09-E-____; Case 09-G-____ (NYS
- Page 81 and 82: Case 09-E-____; Case 09-G-____ (NYS
- Page 83 and 84: Case 09-E-____; Case 09-G-____ (NYS
- Page 85 and 86: Case 09-E-____; Case 09-G-____ (NYS
- Page 87 and 88: Case 09-E-____; Case 09-G-____ (NYS
- Page 89 and 90: Case 09-E-____; Case 09-G-____ (NYS
- Page 91 and 92: Case 09-E-____; Case 09-G-____ (NYS
- Page 93 and 94: Case 09-E-____; Case 09-G-____ (NYS
Case 09-E-____; Case 09-G-____ (NYSEG)DIRECT TESTIMONY OF THE CAPITAL EXPENDITURES,RELIABILITY, AND OPERATIONS PANEL123456789101112131415161718192021Q. Can you please describe NYSEG's projects that are classified as TransmissionMains?A. These projects involve relocating or replacing NYSEG's gas transmissionfacilities including mains <strong>and</strong> cased crossings.Q. What NYSEG projects are classified as Distribution Mains?A. These projects include <strong>the</strong> leak prone main replacement program, extension <strong>of</strong>mains to serve new customers, <strong>and</strong> <strong>the</strong> installation <strong>of</strong> new pipe required to supportorganic growth <strong>of</strong> existing distribution systems.Q. What is NYSEG's <strong>capital</strong> forecast for <strong>the</strong>se projects based upon?A. NYSEG forecasts <strong>the</strong>se <strong>expenditures</strong> based on <strong>the</strong> projected cost to replace 20miles <strong>of</strong> leak prone main, <strong>the</strong> known development projects such as commercial<strong>and</strong> industrial development, residential housing development, subdivisions <strong>and</strong>historical growth information. Expenditures for <strong>the</strong> leak prone main <strong>and</strong> leakprone service replacement programs are based upon historical leak information,risk factors, NYSEG's O&M procedures <strong>and</strong> <strong>the</strong> terms <strong>and</strong> conditions <strong>of</strong> <strong>the</strong>NYSEG m<strong>and</strong>ated programs. Economic development driven projects are alsoincluded in distribution. The <strong>capital</strong> requirements for new business are generallydependent upon <strong>the</strong> economic conditions throughout <strong>the</strong> service territory. Eventhough <strong>the</strong> Company has been experiencing net negative load growth due toequipment efficiencies, a sluggish economy <strong>and</strong> fluctuating commodity cost, abaseline level <strong>of</strong> work continues.73