12.07.2015 Views

direct testimony of the capital expenditures, reliability, and - nyseg

direct testimony of the capital expenditures, reliability, and - nyseg

direct testimony of the capital expenditures, reliability, and - nyseg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Case 09-E-____; Case 09-G-____ (NYSEG)DIRECT TESTIMONY OF THE CAPITAL EXPENDITURES,RELIABILITY, AND OPERATIONS PANEL12345678910111213for contingencies in <strong>the</strong> event <strong>of</strong> <strong>the</strong> loss <strong>of</strong> a single BES element (TPL-002-0), <strong>and</strong> in <strong>the</strong> event <strong>of</strong> <strong>the</strong> loss <strong>of</strong> two or more BES elements (TPL-003-0).As a transmission operator, compliance with Personnel St<strong>and</strong>ards ("PER") <strong>and</strong>Emergency Preparedness St<strong>and</strong>ards ("EOP") would require additional training<strong>and</strong> staffing at <strong>the</strong> NYSEG Energy Control Center ("ECC").Additional control house expansions, separation <strong>of</strong> cable systems, addition <strong>of</strong>battery banks <strong>and</strong> chargers, relay additions, breaker, trip coil, <strong>and</strong> currenttransformer additions would be required.TPL (TPL-001 through TPL-003) for contingencies in <strong>the</strong> event <strong>of</strong> <strong>the</strong> loss <strong>of</strong>a single BES element (TPL-002), <strong>and</strong> in <strong>the</strong> event <strong>of</strong> <strong>the</strong> loss <strong>of</strong> two or moreBES elements (TPL-003) would apply.Compliance with Communications (COM), PER <strong>and</strong> EOP would requireadditional training <strong>and</strong> staffing at <strong>the</strong> RG&E ECC.141516171819202122Q. Has <strong>the</strong> Company prepared <strong>capital</strong> <strong>and</strong> O&M estimates in preparation for FERCaction on exp<strong>and</strong>ing <strong>the</strong> definition <strong>of</strong> bulk transmission?A. The estimated cost impact to NYSEG is included in Exhibit __ (NYSEGCRO-11).Q. What is <strong>the</strong> time frame for <strong>the</strong> <strong>capital</strong> <strong>and</strong> operating expenses shown in Exhibit __(NYSEGCRO-11)?A. The projects shown in <strong>the</strong> <strong>capital</strong> forecast are a one-time cost to bring existingfacilities into compliance, based on currently approved NERC ERO st<strong>and</strong>ardsonly. Revisions to existing st<strong>and</strong>ards or additional st<strong>and</strong>ards could add to <strong>the</strong>se51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!