12.07.2015 Views

direct testimony of the capital expenditures, reliability, and - nyseg

direct testimony of the capital expenditures, reliability, and - nyseg

direct testimony of the capital expenditures, reliability, and - nyseg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Case 09-E-____; Case 09-G-____ (NYSEG)DIRECT TESTIMONY OF THE CAPITAL EXPENDITURES,RELIABILITY, AND OPERATIONS PANEL12345678910111213141516171819202122Q. Can you provide a summary <strong>of</strong> <strong>the</strong> Rainbow Falls Fish Bypass <strong>and</strong> Trash RackProject?A. The Rainbow Falls Station is located in <strong>the</strong> Plattsburgh Division. The FERClicense for Rainbow Falls requires that <strong>the</strong> Company consult with <strong>the</strong> USFWS,<strong>the</strong> NYSDEC <strong>and</strong> <strong>the</strong> New York State Historical Preservation Office to develop afish passage plan by August 18, 2009 <strong>and</strong> <strong>the</strong>n install it by August 18, 2011. Thefish bypass requires <strong>the</strong> installation <strong>of</strong> new racks with ¾ inch bar spacing, a fishentrance <strong>and</strong> control gate, a plunge pool cantilevered <strong>of</strong>f <strong>of</strong> <strong>the</strong> cliff top adjacentto <strong>the</strong> station/rackhouse <strong>and</strong> a 400 foot long two foot diameter transport pipeexiting downstream <strong>of</strong> <strong>the</strong> station tailrace. The required reduction in bar spacing<strong>and</strong> related new infrastructure will increase debris <strong>and</strong> ice buildup across <strong>the</strong>racks. To contend with this issue <strong>and</strong> to maximize energy production, this projectincludes <strong>the</strong> installation <strong>of</strong> a mechanized rack raking system. The project design<strong>and</strong> plan development began in 2008 <strong>and</strong> continues in 2009. In 2010, after wereceive FERC approval <strong>of</strong> <strong>the</strong> plan, we will conduct <strong>the</strong> bidding <strong>and</strong> order <strong>the</strong>long lead equipment. Construction will occur in 2011. The total project cost isestimated to be $940,000. The cost incurred to date is $190,000, with $300,000<strong>and</strong> $450,000 budgeted in 2010 <strong>and</strong> 2011 respectively.Q. Can you please provide a summary <strong>of</strong> <strong>the</strong> Cadyville Trash Rack <strong>and</strong> TrashRacking System project?A. The Cadyville Station is located in <strong>the</strong> Plattsburgh Division. The new license for<strong>the</strong> four stations on <strong>the</strong> Saranac River requires new trash racks with narrower (134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!