12.07.2015 Views

direct testimony of the capital expenditures, reliability, and - nyseg

direct testimony of the capital expenditures, reliability, and - nyseg

direct testimony of the capital expenditures, reliability, and - nyseg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Case 09-E-____; Case 09-G-____ (NYSEG)DIRECT TESTIMONY OF THE CAPITAL EXPENDITURES,RELIABILITY, AND OPERATIONS PANEL123456789101112131415161718192021design <strong>and</strong> bidding process began in 2009 <strong>and</strong> installation is scheduled to occur in2010.Q. What is <strong>the</strong> Mill C Unit 1 <strong>and</strong> Unit 2 Draft Tube Replacement <strong>and</strong> FoundationProject?A. The Mill C Station is located in <strong>the</strong> Plattsburgh Division. The steel draft tubesthat channel water from <strong>the</strong> bottom <strong>of</strong> <strong>the</strong> Unit 1 <strong>and</strong> Unit 2 scroll cases into <strong>the</strong>tailrace were inspected <strong>and</strong> deteriorated draft tubes <strong>and</strong> erosion to <strong>the</strong> powerhousefoundation was identified in 2000. At that time, interim upgrades were installedto address <strong>the</strong> issue <strong>and</strong> Unit 1 <strong>and</strong> Unit 2 were returned to service. Additionalinspections conducted in a de-watered state in <strong>the</strong> summer <strong>of</strong> 2007 identifiedfur<strong>the</strong>r deterioration <strong>of</strong> <strong>the</strong> draft tubes <strong>and</strong> erosion to <strong>the</strong> powerhouse foundation.The installation <strong>of</strong> new steel draft tubes <strong>and</strong> <strong>the</strong> related foundation work isscheduled to occur in 2011 <strong>and</strong> 2012. Fabrication <strong>of</strong> <strong>the</strong> new draft tubes willoccur in 2011, with installation <strong>and</strong> foundation work occurring in 2012. Thisproject will improve unit/plant safety, <strong>reliability</strong> <strong>and</strong> efficiency <strong>and</strong> is consistentwith a plan <strong>and</strong> schedule provided to FERC. The estimated total cost for thisproject is $1.37 million.Q. Are <strong>the</strong>re any major <strong>capital</strong> projects during 2010-2014 in <strong>the</strong> regulatory categorythat are m<strong>and</strong>ated by <strong>the</strong> new FERC hydro licenses?A. Yes. The two most notable projects are <strong>the</strong> Rainbow Falls Fish Bypass <strong>and</strong> TrashRack System <strong>and</strong> <strong>the</strong> Cadyville Trash Rack System.33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!