12.07.2015 Views

Baltimore-Washington Parkway Widening Feasibility Study

Baltimore-Washington Parkway Widening Feasibility Study

Baltimore-Washington Parkway Widening Feasibility Study

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Baltimore</strong>-<strong>Washington</strong> <strong>Parkway</strong> <strong>Widening</strong> <strong>Feasibility</strong> <strong>Study</strong>Traffic and Transportation ImpactsTransportation Improvement Projects in Current Long Range Transportation PlansDraft Long-Range Transportation Plan<strong>Baltimore</strong> Region (September 14, 2011)Long-Range Transportation PlanNational Capital Region MD 295, I-195 to MD 100 I-695 (<strong>Baltimore</strong> Beltway), Inner Loop bridge overBenson Avenue and Leeds Boulevard/SouthwestBoulevard I-95, Interchange at MD 175 MD 100, Howard County Line to I-97 MD 175, MD 295 to MD 170 MD 198, MD 295 to MD 32 MD 3, St. Stephens Church Rd. to MD 32 MD 713 (Ridge Road), MD 175 to MD 176 MD 32, MD 26 to Howard County Line <strong>Baltimore</strong> <strong>Washington</strong> <strong>Parkway</strong>,intersection at MD 193 MD 197, U.S. Route 50 to MD 450 MD 3, U.S. Route 50 to MD 450 MD 450, MD 704 to MD 424 U.S. 1, I-95 to MD 410 U.S. Route 50, westbound ramp toColumbia Park Road5.3AlternativesAnalysisThe traffic and transportation analysis considered an existing base year of 2005 and a future forecastyear of 2040. Both the No-Build and Build conditions were evaluated. The following future scenariosare discussed below:Existing Conditions Scenario.2040 No-Build Scenario.2040 Partial-Build Scenario.2040 Full-Build Scenario.5.3.1ExistingConditionsScenarioThe existing conditions scenario represents the currentlane configuration of the B-W <strong>Parkway</strong>. The existing B-W <strong>Parkway</strong> mainline is typically two general-use travellanes in each direction. The existing three-lane mainlinesections in each direction are along the followingsections of the parkway: from U.S. Route 50 to MDRoute 450, from the Capital Beltway to MD Route 193,and from MD Route 175 to MD Route 100.Lane Configuration2 lanes each direction3 lanes each directionIntersecting routeFigure 5.1. Existing Conditions ScenarioLane Configuration45 November 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!