Download manual

Download manual Download manual

systemapolska.pl
from systemapolska.pl More from this publisher
12.07.2015 Views

SYSTEMA S.p.A.4.2 Assembling the unitAIRTIGHT GAS-FIRED RADIANT TUBES INFRATo assemble the various components that make up theINFRA radiant module, please follow the instructionsgiven below.Begin assembling the tubes, starting with the curvedone:1) Fit the two tubes (delivery and return) into the curveby about 120 mm, hammering slightly if required,taking care to place a piece of wood between thehammer and sleeve (see fig. 18a). Then fix them inplace using the screws supplied with the curve.2a) If Infra 9B and 12B models are used, assemble thetwo sleeves Ø 108mm and Ø80mm, fixing themwith the supplied screws, taking care to push thetubes half way into the sleeve (app. 150 mm), hammeringslightly if required, taking care to place apiece of wood between the hammer and sleeve(see (fig. 18a).2b) If the Infra 6B model is used, assemble the burnerunion and aspirator union as shown in the diagram(fig. 4 page 12), the fixing holes of the aspirator andburner must be positioned vertically as shown in fig.21.3) Fit the other 2 tubes, taking care that the ends withsellotape are positioned at opposite ends to thesleeves (fig. 4 page 12).Fig.17Fig.18WoodFig.18aFig.19Rev. 18GB061024

AIRTIGHT GAS-FIRED RADIANT TUBES INFRASYSTEMA S.p.A.Fig.20HOLEUNIONHOLEBAF BURNERFig. 21 Vertical position of the holeson the aspirator and burner unionsIn Infra 9B a 12B you have to block the pipe 108Ø givingenough space in order to install the Burner Baf lockingFig.21aThe first bracket must be positionedas shown in detail A(fig.23)The intermediate bracketsonly have the bottom elementFig. 22 Assembling the INFRA module: fixing the brackets25Rev. 18GB0610

SYSTEMA S.p.A.4.2 Assembling the unitAIRTIGHT GAS-FIRED RADIANT TUBES INFRATo assemble the various components that make up theINFRA radiant module, please follow the instructionsgiven below.Begin assembling the tubes, starting with the curvedone:1) Fit the two tubes (delivery and return) into the curveby about 120 mm, hammering slightly if required,taking care to place a piece of wood between thehammer and sleeve (see fig. 18a). Then fix them inplace using the screws supplied with the curve.2a) If Infra 9B and 12B models are used, assemble thetwo sleeves Ø 108mm and Ø80mm, fixing themwith the supplied screws, taking care to push thetubes half way into the sleeve (app. 150 mm), hammeringslightly if required, taking care to place apiece of wood between the hammer and sleeve(see (fig. 18a).2b) If the Infra 6B model is used, assemble the burnerunion and aspirator union as shown in the diagram(fig. 4 page 12), the fixing holes of the aspirator andburner must be positioned vertically as shown in fig.21.3) Fit the other 2 tubes, taking care that the ends withsellotape are positioned at opposite ends to thesleeves (fig. 4 page 12).Fig.17Fig.18WoodFig.18aFig.19Rev. 18GB061024

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!