12.07.2015 Views

SIMRAD GD10P - IR GAS DETECTOR - ICEWeb

SIMRAD GD10P - IR GAS DETECTOR - ICEWeb

SIMRAD GD10P - IR GAS DETECTOR - ICEWeb

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

122.1.4 Mounting the <strong>GD10P</strong>The detector is mounted by means of a projecting mounting leg usingtwo M8 screws and washers, or by means of the Duct MountingFlange Kit (4 x M8 screws).Weather ProtectionM8 screwFigure 2.4<strong>GD10P</strong> mounted by means of mounting feet2.2 Electrical connections2.2.1 Terminal compartmentThe terminal compartment is accessible by removing the circularterminal cover. (Loosen the four M5 screws.) Refer to Figure 2.5.The terminal compartment, including the 5 mini-terminals for electricalconnection, is shown in Figure 2.5.The installation wiring enters the terminal compartment via a singleM20 EExe cable gland, which can be mounted on either side of thecompartment. The unused entry is blanked with an EExe cover.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!