12.07.2015 Views

Eclipse ThermJet Burners for Preheated Combustion Air - Power ...

Eclipse ThermJet Burners for Preheated Combustion Air - Power ...

Eclipse ThermJet Burners for Preheated Combustion Air - Power ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 3.2 Bypass start gas circuit schematic➊HeatExchangerto other <strong>Burners</strong>Main gasshut-offvalve trainRatioRegulator➋Automaticshut-off byzone or by burnerNCNC➌to other <strong>Burners</strong>Bypass optionStep 4: Flame monitoringsystemA flame monitoring system consists of two main parts:• A flame sensor• Flame monitoring controlFlame sensorAll <strong>ThermJet</strong> PCA burners operate with UV Scanners only. AU.V. scanner can be used with all combustor types. Youcan find in<strong>for</strong>mation on U.V. scanners in these documents::••••Info Guide 852 <strong>for</strong> 90º U.V. scannersInfo Guide 854 <strong>for</strong> straight U.V. scannersInstruction Manual 855 <strong>for</strong> Solid State UV/IR scannersInfo Guide 856 <strong>for</strong> self-check U.V. scanner.sU.V. scannerNote:Ambient temperature limits <strong>for</strong> rhe scanners are likely to beexceeded. An insulated coupling, heat block seal or scannercooler may be required. See Bulletins 832 and 834.Flame Monitoring ControlThe flame monitoring control is the equipment that processesthe signal from the U.V. scanner.For flame monitoring control you may select several options:• Flame monitoring control <strong>for</strong> each burner: if one burnergoes down, only that burner will be shut off• Multiple burner flame monitoring control: if one burnergoes down, all burners will be shut offThere are three recommended flame monitoring controls:• Bi-flame series; see Instruction Manual 826• Multi-flame series 6000; see Instruction Manual 820• Veri-flame; see Instruction Manual 818Other manufacturer’s flame monitoring systems can be usedwith the burner if spark is maintained <strong>for</strong> a fixed time intervaland is not interrupted when a flame signal is detected duringtrial <strong>for</strong> ignition.14 <strong>Eclipse</strong> <strong>ThermJet</strong> PCA Design Guide No. 206, 3/5/07

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!