12.07.2015 Views

Gather Harvest Installation Instructions (3.30MB PDF) - Allsteel

Gather Harvest Installation Instructions (3.30MB PDF) - Allsteel

Gather Harvest Installation Instructions (3.30MB PDF) - Allsteel

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Gather</strong><strong>Harvest</strong> <strong>Installation</strong>Illustration 7. Bezel Cap <strong>Installation</strong>Bezel CapSheetmetalScrewElectricalClampBracketIf the end condition electrical is not being used,a cover can be installed to cover up the clearancecutouts in the bezel. Slide the bezel cap on topof the base to the bezel until the inside of thebezel cap comes into contact with the electricalclamp bracket.With the bezel cap fully seated against theelectrical clamp bracket, install the 2 sheetmetalscrews to secure it. There is 1 bezel cap suppliedper powered end panel.Illustration 8. Worksurface AttachmentMachine ScrewThe interior screw location on thefull top is a particle board screw.Note: Method described in Illustrations 8 & 9is for the split top model. Pilot holes forthe full top model match the same holeconfiguration as the split top unit.Single sided tops of a split top unit have7 pilot holes.1 set of 2 pilot holes lines up withthe outside set of holes in the end paneltop bracket (Illustration 8 & 9).There is a final set of 3 pilot holes that lineup with the holes in the beam assembly(Illustration 9).Install all 14 screws (7 per side) for bothsides loosely before checkingfor surface edge and end panel facealignment (Illustration 10).Trough – Cavity createdbetween 2 assembledbeam assemblies343-3047Page 3 of 8 (07/12)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!