Planning ProcessThe plan was created under the guidance of the Rose Run Greenway CorridorSteering Committee, a group of volunteers that generously donated their timeand effort to the project. The Steering Committee included members of thegreater <strong>New</strong> <strong>Albany</strong> community including representatives of Village Council,Planning Commission, Architectural Review Board, Parks Advisory Board,Township Trustees, Joint Parks District, <strong>New</strong> <strong>Albany</strong> Community Foundation,<strong>New</strong> <strong>Albany</strong> Company, Village Administration and interested citizens.Public meetings were held at the Village Hall on:May 7, 2003June 11, 2003July 23, 2003August 27, 2003November 19, 2003Rose Run Steering CommitteeColleen BriscoePhil BurgelDon CameronNancy FergusonEileen HullJeremy HullBrian JonesNeil KirbyCraig MohreBill ReschTom RubeyStephen SchwartzChuck StanislavJoe StefanovPlanning TeamMyers Schmalenberger/MSIKeith Myers, PartnerJason Sudy, Planner (Project Manager)Aron Fraizer, PlannerKathryn Meyer, PlannerCharles Benick, Landscape Architectpage iiAt these meetings, the plan concepts were presented, discussed and eventuallyrefined through the collaborative efforts of the Steering Committee andthe Planning Team. Members of the public attended these meetings andparticipated in the planning process.After receiving the endorsement of the Steering Committee, the Rose RunGreenway Corridor Study was presented to the Village Planning Commission,Village Architectural Review Board and the Village Council.Village CouncilColleen Briscoe, MayorMichael Mott, President Pro TemporeNancy Ivers FergusonRichard FisherGlyde MarshStephen PleasnickThomas TaneffVillage AdministrationJoseph Stefanov, Village AdministratorDebra Mecozzi, Deputy Village AdministratorEd Ferris, Village EngineerMitch Banchefsky, Village AttorneyJason Sudy, Village Planner
Table of ContentsList of FiguresList of TablesPageI. Introduction 1Page1 Overall Rose Run Stream Corridor and Tributaries 2Page1 Prioritization Results 32II.Existing CorridorA. VegetationB. HydrologyC. Pedestrian Circulation7810122 Rose Run Corridor Study Area. 33 Rose Run Corridor Sub Areas 34 Existing Riparian Vegetation 85 Proposed Riparian Vegetation 92 General Cost Estimate 33III.Plan ElementsA. Rose Run IIB. Market Street/Dublin-Granville Road IntersectionC. Village Center ParkD. Founders Park15172223266 Current Hydrological Points of Pressure 107 Potential Hydrological Changes 118 Existing Trail Network 129 Proposed Trail Network 1310 Crystal Lake and Campbell Fishing Hole location diagram 18IV. Prioritization & Cost 3111 Rose Run II Concept A 1912 Rose Run II Concept B 20V. Next Steps 3513 Market Street/Dublin-Granville Road Intersection Concept A 2214 Market Street/Dublin-Granville Road Intersection Concept B 2215 Village Center North Concept 2316 Village Center South Concept A 2517 Village Center South Concept B 25page iii18 Founders Park Concept A 2619 Founders Park Concept B 2720 Rose Run Corridor Master Plan 2821 Village Center Civic Core Master Plan 29