11.07.2015 Views

ROSE RUN GREENWAY CORRIDOR - New Albany, Ohio

ROSE RUN GREENWAY CORRIDOR - New Albany, Ohio

ROSE RUN GREENWAY CORRIDOR - New Albany, Ohio

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B. Village Center SouthVillage Center South is a key link in the Rose Run Corridor. This area is apoint of constriction as development has encroached on the stream corridor.This concept proposes an initial reconnection through the pathway system.The Rose Run pathway currently ends just west of the Post Office. <strong>New</strong>pathways are intended across Main Street and in Founders Park, the VillageCenter South portion of the corridor can provide the link between these twoareas as well as to the sidewalk system throughout the Village Center.The initial option for this park area indicates a pathway linkage along thestream floodplain. Due to these floodplain limitations, this concept considersredevelopment of the southern side of the corridor in a manner sensitive tothe stream.As development has encroached on the stream, there has also been a breakin the vegetated edge to the riparian corridor. Concept B contemplates parkuse for a larger section of this area. Reutilizing adjacent areas would allowa reconnection of the vegetated edge to the corridor as well as the pathwaylinkages. In addition, community amenities might be accommodated suchas the small performance amphitheater indicated in that concept.2.) The Main Street Bridge over Rose Runpage 241.) Existing Post Office on Main Street.3.) The eastern end of the existing Rose Run trail.3 421Village Center South photo key.4.) View of the <strong>New</strong> <strong>Albany</strong> Mill at the corner of Main Streetand Dublin-Granville Road.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!