September-2011 d. Input to elevator main line power shunt trip breaker for power shut down from actuation of heat detectors in the hoistway or machine room. e. Supervision of the 110-vac power source to the shunt breaker. - 40
- 41 September-2011
- Page 1 and 2: Department of Veterans Affairs FIRE
- Page 3 and 4: FIRE PROTECTION DESIGN MANUAL DEPAR
- Page 5 and 6: FIRE PROTECTION DESIGN MANUAL DEPAR
- Page 7 and 8: September-2011 E. Strict compliance
- Page 9 and 10: September-2011 Note 3: If buildings
- Page 11 and 12: September-2011 2.10 Fire and Smoke
- Page 13 and 14: Option B. Keying of all locks to ke
- Page 15 and 16: September-2011 3.7 Information Tech
- Page 17 and 18: 4. OCCUPANCY CLASSIFICATION 4.1 Gen
- Page 19 and 20: Number of Occupants Sleeping 1 NA C
- Page 21 and 22: September-2011 Table 5.0 - Minimum
- Page 23 and 24: September-2011 C. To increase avail
- Page 25 and 26: September-2011 Note: Numerous chemi
- Page 27 and 28: February 2011 Note: Seismicity base
- Page 29 and 30: September-2011 Exception 4: FM Appr
- Page 31 and 32: September-2011 D. Flow and pressure
- Page 33 and 34: September-2011 Note: Class B signal
- Page 35 and 36: September-2011 B. Notification of s
- Page 37 and 38: September-2011 Note: For Health Car
- Page 39 and 40: September-2011 Note: The SFPE Handb
- Page 41 and 42: September-2011 C. In accordance wit
- Page 43: September-2011 a. Elevator main lin
- Page 47 and 48: September-2011 4. Operation of the
- Page 49 and 50: NFPA National Fire Protection Assoc
- Page 51 and 52: September-2011 APPENDIX C Applicabl
- Page 53 and 54: Historic Preservation Metrification
- Page 55 and 56: INDEX September-2011 A 33, 34, 36,
- Page 57 and 58: - 53 September-2011
- Page 59 and 60: Question 5 Is this portion of the b
- Page 61 and 62: Caution Areas Harvel ® CPVC Fire S
- Page 63 and 64: SPEARS® MANUFACTURING COMPANY CORP
- Page 65 and 66: Important Information with Regards
- Page 67 and 68: 3.5 Definitions. Common Use. Refers
- Page 69 and 70: Strobe Lamp Coverage Recommended No
- Page 71: This technical assistance is intend
September-2011<br />
d. Input to elevator main line power shunt trip breaker for power shut down from<br />
actuation <strong>of</strong> heat detectors in the hoistway or machine room.<br />
e. Supervision <strong>of</strong> the 110-vac power source to the shunt breaker.<br />
- 40