September-2011<br />
F. Delineate on the drawings special conditions such as storage racks/shelving location, height<br />
<strong>and</strong> configuration (including mobile shelving); atria; open ceilings, or architecturally<br />
sensitive areas; audiometric booths; walk-in freezers <strong>and</strong> cold rooms; computer rooms <strong>and</strong><br />
raised flooring; loading docks <strong>and</strong> exterior canopies; residential sleeping etc. which may<br />
have an impact on sprinkler design <strong>and</strong> installation.<br />
G. Coordinate with the facility <strong>and</strong> show smoke zone boundaries, hazard classification, density,<br />
<strong>and</strong> other special requirements on drawings. Sprinkler zones shall coincide with all smoke<br />
zone boundaries within health care occupancies.<br />
Note: Since the sprinkler contractor is required by NFPA 13 to hydraulically calculate the<br />
system <strong>and</strong> provide working drawings, this effort should not be duplicated by the A/E. Some<br />
items commonly not identified on the drawings that create problems are drain terminations,<br />
hazard classification, smoke zone boundaries, <strong>and</strong> water supply hydraulic information. The<br />
contractor needs to know where to start, what water supply is available, the commodities<br />
being protected, what area is supplied by each flow switch, <strong>and</strong> special circumstances such<br />
as areas subject to freezing <strong>and</strong> combustible concealed spaces.<br />
H. Rooms containing bulk supply storage shall be classified as required by NFPA 13. If<br />
provided by the contract, storage racks shall utilize open shelving systems. Ensure shelving<br />
which obstructs sprinkler water from penetrating down through racks is not used.<br />
I. Provide seismic protection when the building is in an area <strong>of</strong> Moderate High, High, or Very<br />
High seismicity as identified in the map below taken from VA Seismic <strong>Design</strong> Requirements<br />
H-18-8. (Refer to H-18-8 for updated requirements. See<br />
http://www.cfm.va.gov/til/etc/seismicmap.pdf for latest version.)<br />