PS10, 11MWe Solar Thermal Power Plant in Seville, Spain - Derbi
PS10, 11MWe Solar Thermal Power Plant in Seville, Spain - Derbi
PS10, 11MWe Solar Thermal Power Plant in Seville, Spain - Derbi
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ABENGOASOLUCARPlataforma <strong>Solar</strong> de Sanlúcar la Mayor
ABENGOAPlataforma <strong>Solar</strong> de Sanlúcar la Mayor: Un esfuerzo colectivoABENGOASOLUCAR• Varias universidades y centros de <strong>in</strong>vestigación.• Innumerables proveedores de equipos y servicios.• Entidades f<strong>in</strong>ancieras.
ABENGOAAbengoa: Nuestro CompromisoLos científicos nos dicen que elCambio Climático es unarealidad……y desde Abengoa creemos quees el momento de desarrollar y aplicar Soluciones
SOLUCARSolúcar: La empresa de Abengoa para Energía <strong>Solar</strong>A partir del sol… producimos energíaeléctrica por vía termoeléctrica y fotovoltaica
SOLUCARAbengoa y la Energía <strong>Solar</strong>: El Origen• 1984. Plataforma <strong>Solar</strong> de Almería (Ciemat, DLR).• Los 80. Sum<strong>in</strong>istro y construcción de equipamientos.• Los 90. Proyectos de I+D+i en termosolar y fotovoltaica.• 2003. Lanzamiento de laPlataforma <strong>Solar</strong>de Sanlúcar la Mayor.
SOLUCAR<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong><strong>PS10</strong><strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong><strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>Brief HistoryFICHTNER
SOLUCAR R&DTheBirthoftheProject<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>1999 2000 2001 2002 2003 2004 2005 2006• Spanish laws <strong>in</strong> Dec 1998, solar tariff (0,18€ + pool) to kWh•Inabensa hadbeen later<strong>in</strong>volved <strong>in</strong> Colón<strong>Solar</strong> project andhad acquiredsome know-howon heliostatsmanufacture.• Abengoaproposes an ownproject <strong>in</strong> 1999. Itis <strong>PS10</strong> (<strong>Plant</strong>a<strong>Solar</strong> 10MW).Colón <strong>Solar</strong> 70m2 HeliostatTSA Receiver <strong>in</strong> PSA
SOLUCAR R&DTheBirthoftheProject<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>1999 2000 2001 2002 2003 2004 2005 2006• Inabensa prepares a proposal to 5th FP of EC that is awarded with 5,0M€subsidy to support <strong>PS10</strong>, a 35,0M€ project.• Several objectives for <strong>PS10</strong> project• The project ispresented toAndalucíaAutonomicGovernment and isgranted with anadditional 1,2M€subsidy•No tariff is thenconsidered for solarthermal electricityTSA Receiver <strong>in</strong> PSA
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>The First Difficulties1999 2000 2001 2002 2003 2004 2005 2006• <strong>PS10</strong> project officially starts for EC <strong>in</strong> Jan 2000, 36 months duration, till Dec 2002•It is requested to EC a postponement of 18 months for the project stat<strong>in</strong>g date.• In parallel, activities for <strong>PS10</strong> cont<strong>in</strong>ue, neverstopped• Permit<strong>in</strong>g activities advanced, grid connection,<strong>in</strong>dustrial use for land, regimen special, use of water,etc…•Solúcar develops a bigger heliostat and beg<strong>in</strong>s to<strong>in</strong>corporate volumetric air receivers technology <strong>in</strong>the ceramic technology (Hit-Rec) and <strong>in</strong> the metallicabsorbers technology (SiRec).Hit-Rec II 300kWt ReceiverSirec 300kWt Receiver
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>Advanc<strong>in</strong>g without a Clear Horizont1999 2000 2001 2002 2003 2004 2005 2006• By 2001 <strong>PS10</strong> project is mature. It is composed by a 981 heliostats 90m2, and avolumetric wire mesh air receiver• A detailed offer is contracted for the whole receiver technology, <strong>in</strong>clud<strong>in</strong>gblowers, heat storage system, and steam generator.ReceiverHot Air 680ºCSteam65 bar, 460ºC<strong>Power</strong> Block≈Heat StorageCondensate1 bar, 50ºCHeliostat FieldBlower 1Cold Air 110ºC Blower 2Steam Generator• There is no solar tariff.
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>Difficult Times1999 2000 2001 2002 2003 2004 2005 2006• By August 2002 Spanish Government is f<strong>in</strong>ally sensible to the solar thermalpressure and publishes a tariff of 0,12€ per kWh.• <strong>PS10</strong> project is the re-launched. A heliostat of 120m2 is developed to fit withnew solar tariff.• Solair R&D project is alsoadvanc<strong>in</strong>g, and hav<strong>in</strong>g goodresults.Solair 300kWt Receiver
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>The Light at the End of the Tunnel1999 2000 2001 2002 2003 2004 2005 2006• Solúcar receives a good design work fromKAM, but budget quotation for a total of13,0M€ for the offered air volumetric ceramicsystem seems too high• This offer, together to the low 0,12€/kWhsolar tariff don´t allow <strong>PS10</strong> project to reacheconomical feasibility•Saturated steam generation <strong>in</strong> the receiver isdetected as the optimal possibility to feed asaturated steam turb<strong>in</strong>e•Tecnical feels confortable with saturatedsteam and gives an offer for 6.5M€.
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>The Construction1999 2000 2001 2002 2003 2004 2005 2006Aerial View of the <strong>PS10</strong> plant construction by June 2005
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>The Construction1999 2000 2001 2002 2003 2004 2005 2006Aerial View of the <strong>PS10</strong> plant construction by October 2005
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>The Construction1999 2000 2001 2002 2003 2004 2005 2006Aerial View of the <strong>PS10</strong> plant construction by December 2005
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>End<strong>in</strong>g1999 2000 2001 2002 2003 2004 2005 2006<strong>PS10</strong>, heliostats test<strong>in</strong>g, 2006
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>End<strong>in</strong>g1999 2000 2001 2002 2003 2004 2005 2006<strong>PS10</strong>, Assembly of Receiver Absorber Panels, April 2006
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>End<strong>in</strong>g1999 2000 2001 2002 2003 2004 2005 2006<strong>Thermal</strong> Storage System and Refrigeration Towers
SOLUCAR R&D<strong>PS10</strong>, <strong>11MWe</strong> <strong>Solar</strong> <strong>Thermal</strong> <strong>Power</strong> <strong>Plant</strong> <strong>in</strong> <strong>Seville</strong>, Spa<strong>in</strong>End<strong>in</strong>g1999 2000 2001 2002 2003 2004 2005 2006Saturated Steam GE Turb<strong>in</strong>e and Steam Drum
SOLUCARStrategic Plan 300MWAbengoa, Strategic <strong>Solar</strong> PlanAbengoa Abengoais is deeply deeply bid<strong>in</strong>g bid<strong>in</strong>g to to <strong>in</strong>vest <strong>in</strong>vestmore more than than 1.200 1.200 mill€ mill€ for for more more than than300MW 300MW of of solar solar technologies technologies for forelectricity electricity generation. generation. This This<strong>in</strong>vestment <strong>in</strong>vestment will will suppose suppose the the creation creationof of the the major major European European <strong>Solar</strong> <strong>Solar</strong> Facility Facility<strong>in</strong> <strong>in</strong> Sanlúcar Sanlúcar la la Mayor. Mayor. This This facility facility is iscalled called Plataforma Plataforma<strong>Solar</strong> <strong>Solar</strong> Sanlúcar Sanlúcar la laMayor, Mayor, PSSM. PSSM.
SOLUCARPlataforma <strong>Solar</strong> de Sanlúcar la Mayor
SOLUCARPlataforma <strong>Solar</strong> de Sanlúcar la Mayor•300 MW.• 1200 millones de euros de<strong>in</strong>versión.• 800 hectáreas.• 180.000 hogares.• Evita la emisión de 600.000toneladas de CO2 anuales.
SOLUCARComb<strong>in</strong>ación de Tecnologías
SOLUCAR<strong>PS10</strong>: Primera <strong>Plant</strong>a en Operación• Primera Torre comercial del mundo.• 120 metros de altura.• 624 heliostatos de 120 metros.•11 MW.• 6000 hogares.
SOLUCAR<strong>PS10</strong>: Primera <strong>Plant</strong>a en Operación
SOLUCARPS20: En Construcción• Torre de 160 metros de altura.• 1255 heliostatos.•20 MW.• 12.000 hogares.
SOLUCARSolnova 1: <strong>Plant</strong>a con tecnología cil<strong>in</strong>droparabólica• Construcción empieza en abril.• 54.000 metros de colectores.• Cada colector tiene 6 metrosde diámetro.•50 MW.
SOLUCARAZ TH – Stirl<strong>in</strong>g Dishes• Construcciónempezó en Marzo 07• 8 unidades• 10 kW cada uno.• 80 metros cuadrados
SOLUCAR Sevilla PV: En producción desde abril 2006• Primera planta de concentraciónfotovoltaica del mundo.SOLUCAR• 154 seguidores de doble eje.• 1,2 MW.
SOLUCARI+D: Construyendo el Futuro• 50 expertos.• Colaboraciones con Ciemat,NREL, DLR, varias universidades.•Mejora de tecnologías actualesy desarrollo de nuevas.
SOLUCARBeneficios Sociales de la Plataforma• Economía local de Sanlúcar laMayor, Aznalcóllar yAznalcázar.• 1.000 empleos en fabricacióny construcción.• 300 empleos en operación.• Evita la emisión de 600.000Tm de CO2 anuales.•Integración en el medio.
SOLUCAREl FuturoDe Sanlúcar a España y al mundo
SOLUCAR R&DGEF Projects and OthersConcept of anIntegrated <strong>Solar</strong> Comb<strong>in</strong>ed Cycle <strong>Plant</strong>(ISCC)400°CExhaust150°CParabolic trough CollectorsHRSGSteam500°C, 100barSteam turb<strong>in</strong>e70 MWG ~Exhaust600°CCondenserG ~Electricity to the gridGas turb<strong>in</strong>e65 MW
SOLUCAR R&DGEF Projects and OthersAlgeria
SOLUCAR R&DThank you very much