11.07.2015 Views

Metropolitan Mine Traffic Management Plan - Peabody Energy

Metropolitan Mine Traffic Management Plan - Peabody Energy

Metropolitan Mine Traffic Management Plan - Peabody Energy

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Traffic</strong> <strong>Management</strong> <strong>Plan</strong>1 INTRODUCTIONThe <strong>Metropolitan</strong> <strong>Mine</strong> is owned and operated by Helensburgh Coal Pty Ltd (HCPL), a wholly ownedsubsidiary of <strong>Peabody</strong> <strong>Energy</strong> Australia Pty Ltd. HCPL was granted approval for the <strong>Metropolitan</strong> CoalProject (the Project) under Section 75J of the New South Wales (NSW) Environmental <strong>Plan</strong>ning andAssessment Act, 1979 (EP&A Act) on 22 June 2009 (the Approval). A copy of the Project Approval isavailable on the <strong>Peabody</strong> website (http:/www.peabodyenergy.com.au).The Project comprises continuation, upgrade and extension of underground coal mining operationsand surface facilities at the existing <strong>Metropolitan</strong> <strong>Mine</strong>. The regional location and approvedunderground mining Project layout are shown on Figures 1 and 2 respectively.1.1 PURPOSE AND SCOPEThis <strong>Traffic</strong> <strong>Management</strong> <strong>Plan</strong> (TMP) has been prepared for the Project in accordance withCondition 22, Schedule 4 of the Project Approval. The primary aim of the TMP is to minimise the trafficimpacts of the Project on the residential areas and schools within Helensburgh.The relationship of this TMP to the <strong>Metropolitan</strong> <strong>Mine</strong> environmental management structure is shownon Figure 3.Section 3.1 outlines other Approval Conditions of relevance to the TMP. This includes a requirement toconduct a Road Safety Audit of the <strong>Mine</strong> Access Road and Parkes Street intersection in accordancewith Condition 17, Schedule 4 of the Project Approval. The Road Safety Audit is described inSection 8.1. HCPL will implement the Road Safety Audit recommendations to the satisfaction of theDirector-General.1.2 STRUCTURE OF THE TMPThe remainder of the TMP is structured as follows:Section 2:Section 3:Section 4:Section 5:Section 6:Section 7:Section 8:Section 9:Section 10:Section 11:Section 12:Section 13:Describes the review and update of the TMP.Outlines the statutory requirements applicable to the TMP.Describes the <strong>Metropolitan</strong> <strong>Mine</strong> off-site haulage of coal and coal reject.Provides baseline data.Describes the consultation undertaken for the development of the TMP.Details the performance indicators that will be used to assess the Project.Describes traffic management measures.Describes the monitoring program.Provides a Contingency <strong>Plan</strong> to manage any unpredicted impacts and theirconsequences.Describes the annual review and improvement of environmental performance.Outlines the management and reporting of incidents, complaints and noncompliances.Lists the references cited.<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Traffic</strong> <strong>Management</strong> <strong>Plan</strong>Revision No. TMP-R01-D Page 1Document ID: <strong>Traffic</strong> <strong>Management</strong> <strong>Plan</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!