11.07.2015 Views

Metropolitan Mine Traffic Management Plan - Peabody Energy

Metropolitan Mine Traffic Management Plan - Peabody Energy

Metropolitan Mine Traffic Management Plan - Peabody Energy

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Traffic</strong> <strong>Management</strong> <strong>Plan</strong>In addition, Condition 2, Schedule 7 of the Project Approval outlines management plan requirementsthat are applicable to the preparation of the TMP. Table 1 indicates where each component of thiscondition is addressed within this TMP.Table 1<strong>Management</strong> <strong>Plan</strong> RequirementsProject Approval ConditionTMP SectionCondition 2 of Schedule 72. The Proponent shall ensure that the management plans required under thisapproval are prepared in accordance with any relevant guidelines, and include:b) detailed baseline data; Section 5c) a description of:• the relevant statutory requirements (including any relevant approval,licence or lease conditions);Section 3• any relevant limits or performance measures/criteria; Not applicable• the specific performance indicators that are proposed to be used tojudge the performance of, or guide the implementation of, the projector any management measures;d) a description of the measures that would be implemented to comply withthe relevant statutory requirements, limits, or performancemeasures/criteria;e) a program to monitor and report on the:Section 7Sections 8, 9 and 10Sections 8, 9 and 11• impacts and environmental performance of the project;• effectiveness of any management measures (see c above);f) a contingency plan to manage any unpredicted impacts and theirconsequences;g) a program to investigate and implement ways to improve theenvironmental performance of the project over time;Section 10Section 11h) a protocol for managing and reporting any;• incidents; Section 12• complaints; Section 12• non-compliances with statutory requirements; and Section 12• exceedances of the impact assessment criteria and/or performancecriteria; andNot applicablei) a protocol for periodic review of the plan. Section 2<strong>Metropolitan</strong> <strong>Mine</strong> – <strong>Traffic</strong> <strong>Management</strong> <strong>Plan</strong>Revision No. TMP-R01-D Page 7Document ID: <strong>Traffic</strong> <strong>Management</strong> <strong>Plan</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!