11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

during rainy season by flowing alongwith the storm water. Direct exposure ofworkers to fly ash & dust should be avoided.xiv.xv.xvi.xvii.xviii.xix.As proposed, fly ash will be transferred in the covered truck. Ash shall betransferred to the brick manufacturing. A tie-up should be made with brickmanufacturer.Occupational health surveillance programme should be undertaken as regularexercise for all the employees. The first aid facilities in the occupational healthcentre should be strengthened and the regular medical test records of eachemployee should be maintained separately.Dedicated parking facility for loading and unloading of material should beprovided in the factory premises. Unit should develop and implement good trafficmanagement system for their incoming and outgoing vehicles to avoidcongestion on the public road.As proposed, thick green belt in 1.7 ha. out of total land 4.85 ha will bedeveloped all round the plant boundary to act as noise attenuator and plantationshall be done as per the CPCB guidelines in consultation with DFO. Thickgreenbelt with suitable plant species shall be developed around the proposeddistillery to mitigate the odour problem.All the commitments made to the public during the Public Hearing/PublicConsultation meeting held on 17 th March, 2012 should be satisfactorilyimplemented and a separate budget for implementing the same should beallocated and information submitted to the Ministry’s Regional Office atBangalore.At least 5 % of the total cost of the project should be earmarked towards thecorporate social responsibility and item-wise details along with time bound actionplan should be prepared and submitted to the Ministry’s Regional Officeat Bangalore. Implementation of such program should be ensured accordingly ina time bound manner.2.5.10. Expansion of Bulk Drugs Unit (166.62 to 393.381 MTPM) at Plot No. E-9, MIDCIndustrial Area, Village Chikalthana, Tehsil & District Aurangabad, Maharashtra byM/s Harman Finochem Ltd. (TOR to EC).The proponent did not attend the meeting. The Committee decided to considerthe project as and when requested by the proponent.2.5.11. Bulk Drug Unit (1575 TPA) at Sy. Nos. 595, 596 & 597, Village Talamadla, DistrictNizamabad, A.P by M/s Posh Chemicals Pvt. Ltd. (TOR to EC).The project authorities and their consultant (Pragthi Labs & Consultants Pvt. Ltd.)gave a detailed presentation on the salient features of the project and proposedenvironmental protection measures to be undertaken as per Draft Terms of References(TORs) awarded during the 25 th Meeting of the Expert Appraisal Committee (Industry)held during 28 th –30 th July, 2011 for preparation of EIA/EMP.All Synthetic Organic

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!