xxi.xxii.xxiii.Project proponent shall comply with the environment protection measures andsafeguards recommended in the EIA/EMP/risk analysis report/disaster managementplan.The company shall take measures after completion of drilling process by wellplugging and secured enclosures, decommissioning of rig upon abandonment of thewell and drilling site shall be restored in original condition. In the event that noeconomic quantity of hydrocarbon is found a full abandonment plan shall beimplemented for the drilling site in accordance with the applicable Indian PetroleumRegulations.Occupational health surveillance of the workers shall be carried out as per theprevailing Acts and Rules.xxiv. Company shall adopt Corporate Environment Policy as per the Ministry’s O.M. No. J-11013/41/2006-IA.II(I) dated 26 th April, 2011and implemented.xxv.xxvi.All the commitments made to the public during the Public Hearing/PublicConsultation meeting held on 24 th May, 2012 should be satisfactorily implementedand a separate budget for implementing the same should be allocated andinformation submitted to the Ministry’s Regional Office at Bhubaneswar.At least 5 % of the total cost of the project should be earmarked towards theenterprise social commitment and item-wise details along with time bound actionplan should be prepared and submitted to the Ministry’s Regional Officeat Bhubaneswar. Implementation of such program should be ensured accordingly ina time bound manner.2.5.7. Grain based Distillery Unit (30 KLD) at Gat No 105/1/1B, Village Sadgaon, Taluka &District Dhule, Maharashtra by M/s Megi Agro Chem Ltd. (TOR to EC).The Committee noted that EIA/EMP report was prepared by M/s EquinoxEnvironment (I) Pvt. Ltd, Kolhapur, who is a non-accredited consultant as on date.Therefore, Committee advised them to validate EIA/EMP report first by the QCI/NABETaccredited consultant and submitted to the Ministry for consideration of environmentalclearance.The proposal was deferred till EIA/EMP report validated by the QCI/NABETaccredited consultant is submitted.2.5.8. Distillery Unit (Grain based, 120 KLPD) and Co-generation Power Plant (3.5 MW) atVillage Chandrao, Tehsil Indri, District Karnal, Haryana by M/s RSL Distilleries Pvt.Ltd. (TOR to EC)The project authorities and their consultant (CPTL Envirotech)gave a detailedpresentation on the salient features of the project and proposed environmentalprotection measures to be undertaken as per Draft Terms of References (TORs)awarded during the 24 th Meeting of the Expert Appraisal Committee (Industry) heldduring 22 nd -23 rd June, 2011 for preparation of EIA/EMP. All the non-molasses based

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!