11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

xviii. In case the commercial viability of the project is established, the Company shouldprepare a detailed plan for development of oil and gas fields and obtain freshenvironmental clearance from the Ministry.xix. Restoration of the project site should be carried out satisfactorily and report shouldbe sent to the Ministry’s Regional Office at Bhopal.xx.Oil content in the drill cuttings should be monitored by some Authorized agencyand report should be sent to the Ministry’s Regional Office at Bhopal.xxi. Under Corporate Social Responsibility (CSR), sufficient budgetary provision shouldbe made for health improvement, education, water and electricity supply etc. in andaround the project.xxii. Company should have own Environment Management Cell having qualifiedpersons with proper background.xxiii. Company should prepare and circulate the environmental policy.xxiv. Company should prepare operating manual in respect of all activities. It shouldcover all safety & environment related issues and system. Measures to be takenfor protection. One set of environmental manual should be made available at thedrilling site/ project site. Awareness should be created at each level of themanagement. All the schedules and results of environmental monitoring should beavailable at the project site office.2.5.6. Development & Production of wells alongwith Surface Facilities, Phase-III of CBMBlock RG(E)-CBM-2001/1, Raniganj CBM Block, West Bengal by M/s Essar OilLimited (E&P Division) (TOR to EC )The project authorities and their consultant (SENES Consultants India Pvt.Ltd.)gave a detailed presentation on the salient features of the project and proposedenvironmental protection measures to be undertaken as per Draft Terms of References(TORs) awarded during the 30 th Meeting of the Expert Appraisal Committee (Industry)held during 15 th –16 th December, 2011 for preparation of EIA/EMP.All the oil and gasproduction projects are listed at S.N. 1(b) under under Category ‘A’ and appraised at theCentral level.M/s Essar Oil Limited (E&P Division) have proposed for the Development& Production of wells alongwith Surface Facilities, Phase-III of CBM BlockRG(E)-CBM-2001/1, Raniganj CBM Block, West Bengal. Essar Oil ltd & Govt. ofIndia signed a contract for exploration and production of coal bed methane(CBM) from block RG (East) – CBM-2001/1 on 26 th July, 2002. Block is located inRaniganj Coal Field, West Bengal at latitude 23 o 21‘45”N & 23 o 41’12”N andlongitude 87 o 14’40E & 87 o 28’46E. Total block area is 500 Km 2 & spread in

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!