(0.04695ug/m 3 ), SO 2 (0.01485ug/m 3 ) and NOx (0.02731ug/m 3 ).Cyclone separatorfollowed by bagfilter alongwith stack (30m) will be provided to proposed agro waste firedboiler. Scrubbing arrangement will be provided to Incinerator. Solvent will be recovered.Total fresh water requirement will be increased from 16 m 3 /day to 176 m 3 /dayafter expansion and met from ground water. The total wastewater generation will beincreased from 5.7 m 3 /day to121m 3 /day and out of which, industrial wastewatergeneration will be increased from 3.8 m 3 /day to 121 m 3 /day. Industrial effluent will besegregated into high COD, high TDS and low COD/TDS effluent streams. High CODeffluent stream will be incinerated. High TDS effluent will be treated through RO. LowCOD/TDS effluent will treated in ETP. Committee advised them that high TDS effluentshould be treated with steam stripper before sending through the RO. Rejects from ROshould be evaporated in MEE. Treated effluent will be recycled and reused with factorypremises. No additional treated effluent will be sent to CETP of M/s ECPL.However,effluent (3.8 m3/day) generated from the existing unit will be sent to CETP of M/s EICL,Umaraya. Sewage will be treated through septic tank and soak pit.ETP sludge will be sent to TSDF, NECL. Spent solvent and process waste will besent for incineration of CHWI, NECL. Used oil will be sold to registered re-processor.Discarded containers will be sold to GPCB authorized dealer after decontamination. Acopy of membership of TSDF operated by M/s Nandesari Environmental Control Ltd. issubmitted. Green belt will be developed in 2,460 m 2 , out of 7,670 m 2 total land. Powerrequirement (100 KW) will be met from GEB. Agro waste consumption will be increasedfrom 0.7 TPD to2.8 TPD. DG set (125 KVA) will be installed as standby.The Committee deliberated upon the issues raised during the Public Hearing /Public Consultation meeting conducted by the Gujarat Pollution Control Board on 2 ndMarch, 2012. The issues raised during public hearing were water consumption and itssource, use of rainwater harvesting, fire station, use surface water instead of Narmadawater, ETP capacity, local employment, proper chemical storage etc.In response, projectproponent informed that ETP of capacity 113 m3/day will be installed to cater additionaleffluent load. Treated water will be recycled/ reused. Air pollution control device will beinstalled. Employment would be mostly given to locals as in the existing unit and trainingwould be provided for the same and have satisfactorily been responded by the projectproponent and incorporated in the final EIA/EMP report.After deliberations, the Committee desired following additional information:1. Recommendation on project proposal from Gujarat Pollution Control Board to besubmitted.2. Revised effluent treatment scheme considering entire plant zero discharge.3. Detailed specification of incinerator.The proposal is deferred till the desired information is submitted. The aboveinformation shall be provided with the uploading of minutes on the website.2.5.4. Single Super Phosphate (Powder & Granular, 1500 MTPD), N 2 SiF6, 130 MTPD),NPK Fertilizer (Powder & Granular, 500 MTPD), LABASA (500 MTPD), BenzeneSulphonyl Chooride (20 MTPD), Sulphone (1.26 MTPD) at Sy. No. 525, 532, 554-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!