11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.4.8. Proposed Integrated Cement Project (Clinker- 2.2 MTPA, Cement - 3.3 MTPA) alongwith installation of Captive Power Plant (30 MW), WHRB (5 MW) and DG Set (6 MW)at Villages Tunkara & Balara, Tehsil Jaitaran, District Pali in Rajasthan by M/sUltraTech Cement Limited - regarding amendment in TORsThe above proposal was accorded ToRs for preparation of EIA/EMP report on14.2.2012. The project area proposed was 210 ha. One of the ToR was to maintain aminimum distance of 100 m from the project site and the drainage/stream. In order tocomply with the said ToR it is proposed to revise the project area from 210 ha. to 248ha. with proportionate increase of green belt. The existing and revised layouts weresubmitted.The committee recommended for the revision of project area from 210 ha. to248 ha. with the same ToRs dated 14.2.2012.30 th October, 20122.5.0 Consideration of the Projects:2.5.1. Manufacture of Resins (5,520 TPA) at J.L. No. 01, Village Tulsiberia, R.S. Dag No.2188 to 2194, 2196, 2297 to 2299, District Howrah, West Bengal by M/s AlmegaPaints Pvt. Ltd. - regarding EC.The project authorities and their consultant, M/s Envirotech East Pvt. Ltd.,Kolkata gave a detailed presentation on the salient features of the project and proposedenvironmental protection measures to be undertaken as per Terms of Reference (TORs)awarded during the 23 rd Meeting of the Expert Appraisal Committee (Industry-2) heldduring 30.5.2011 – 31.5.2011 for preparation of EIA/EMP. All the Resin manufacturingplants located outside notified industrial area are listed at S.No. 5(f) under Category ‘A’of the Schedule of EIA Notification, 2006 and appraised by the Expert AppraisalCommittee (Industry) of MoEF.M/s Almega Paints Pvt. Ltd. have proposed to manufacture Resins (5,520 TPA)at J.L. No.01, Village Tulsiberia, R.S. Dag No.2188 to 2194, 2196,2297 to 2299, DistrictHowrah, West Bengal. Water based (1,980 TPM) and solvent based paint (1,980 TPM)blending & mixing units already exist, which did not require EC. ‘Consent to Establish’and ‘Consent to Operate’ have been accorded by the West Bengal Pollution ControlBoard for the existing water and solvent based paint units. The proposed project will beinstalled within theexisting plant having total acquired land of 8.71 acres and green beltwill be developed in 33% of the total area. No national park/ wild life sanctuary is locatedwithin 10 Km distance.Total project cost is Rs. 4.5 Crores.Castor oil, Rawlinseed oil, phthalic anhydride, mixed xylene, resin, sorbitol (70%)etc. will be used as raw materials. The power requirement for the proposed project isabout 200 KVA, which will be sourced from West Bengal State Electricity DistributionCompany Limited.There will be no process emissions during the plant operation. Theonly emission through Chimney will be due to the burning of fuel (High Speed Diesel) in3 nos. Thermic Fluid Heaters for heating Thermo Pack, which will result in the negligible

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!