6. Regular monitoring of influent and effluent surface, sub-surface and ground watershall be ensured and treated wastewater shall meet the norms prescribed by theState Pollution Control Board or described under the Environment (Protection)Act, 1986 whichever are more stringent. Leachate study for the effluentgenerated and analysis should also be regularly carried out and report submittedto the Ministry’s Regional Office at Bhopal, SPCB and CPCB.7. The total water requirement shall not exceed 74 m 3 /day. ‘Zero’ effluent dischargeshall be strictly followed and no wastewater should be discharged outside thepremises.8. Efforts shall be made to make use of rain water harvested. If needed, capacity ofthe reservoir should be enhanced to meet the maximum water requirement. Onlybalance water requirement should be met from other sources.9. Slag produced in Ferro Manganese (Fe-Mn) production shall be used inmanufacture of Silico Manganese (Si-Mn). The Si-Mn slag shall be used in thepreparation of building materials.10. No Ferro Chrome shall be manufactured without prior approval from the Ministryof Environment & Forests.11. Risk and Disaster Management Plan along with the mitigation measures shouldbe prepared and a copy submitted to the Ministry’s Regional Office at Bhopal,SPCB and CPCB within 3 months of issue of environment clearance letter.12. As proposed, green belt should be developed in at least 33 % of the project area.Selection of plant species shall be as per the CPCB guidelines in consultationwith the DFO.13. At least 5 % of the total cost of the project should be earmarked towards theEnterprise Social Commitment based on locals need and item-wise details alongwith time bound action plan should be prepared and submitted to the Ministry’sRegional Office at Bhopal. Implementation of such program shall be ensuredaccordingly in a time bound manner.2.3.4. Integrated Aluminium Complex (Aluminium Smelter, 0.175 MTPA) and Captive PowerPlant (4x120 MW) at Villages Markata, Kadua, Mahupal, Bhagirathpur Sajan,Samatangi, Manjakana, Malapura, Balabhadrapurpatna, Analabareni, TehsilKamakhyanagar, District Dhenkanal in Orissa by M/s RSB MetalTech Pvt. Limited -regarding reconsideration for EC.The above proposal was considered in the 35 th Meeting of the Expert AppraisalCommittee (Industry-1) held during 26 th & 27 th April, 2012. The Committee recommendedthe project for environmental clearance subject to submission of revised layout plan andland requirement after excluding the downstream facilities since the downstreamfacilities are going to be part of SEZ, R &R plan submitted to the State Govt.,Management plan for SOx and NOx reduction and the stipulation of specific conditionsalong with other environmental conditions.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!