11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Grain size analysis of quartziteRevised OHS planCertificate from local DFO regarding the elephant corridorTrace element management planThe above information was submitted by the proponent to MoEF and all theCommittee members. The Committee found the information submitted to be adequateand suggested to stipulate following specific conditions alongwith other environmentalconditions while considering for accord of environmental clearance:1. No charcoal shall be used as fuel. Pet coke shall be used as fuel instead ofcharcoal from unknown sources.2. Continuous monitoring facilities for the process stacks and sufficient air pollutioncontrol equipments viz. fume extraction system with bag filters, ID fan and stackof adequate height to submerged arc furnace shall be provided to controlemissions below 50 mg/Nm 3 .3. The National Ambient Air Quality Standards issued by the Ministry vide G.S.R.No. 826(E) dated 16 th November, 2009 shall be followed.4. Secondary fugitive emissions from all the sources shall be controlled within thelatest permissible limits issued by the Ministry and regularly monitored.Guidelines / Code of Practice issued by the CPCB shall be followed.5. Regular monitoring of influent and effluent surface, sub-surface and ground watershall be ensured and treated wastewater shall meet the norms prescribed by theState Pollution Control Board or described under the Environment (Protection)Act, 1986whichever are more stringent. Leachate study for the effluent generatedand analysis should also be regularly carried out and report submitted to theMinistry’s Regional Office at Bhubaneswar, SPCB and CPCB.6. The total water requirement shall not exceed 80 m 3 /day. ‘Zero’ effluent dischargeshall be strictly followed and no wastewater should be discharged outside thepremises.7. Efforts shall be made to make use of rain water harvested. If needed, capacity ofthe reservoir should be enhanced to meet the maximum water requirement. Onlybalance water requirement should be met from other sources.8. Slag produced in Ferro Manganese (Fe-Mn) production shall be used inmanufacture of Silico Manganese (Si-Mn). The Si-Mn slag shall be used in thepreparation of building materials.9. No Ferro Chrome shall be manufactured without prior approval from the Ministryof Environment & Forests.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!