11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ecommended that the proposal shall be considered after submission of final EIA/EMPreport along with public hearing proceedings and its commitments.The Committee also prescribed the following additional TORs for preparation ofrevised EIA/EMP report:1. Photographs of the existing and proposed plant area.2. Compliance to the conditions stipulated in the Environmental Clearance / NOCgranted by the SPCB.3. A certified report of the status of compliance of the conditions stipulated in theenvironmental clearance and Consent to Operate for the ongoing I existingoperation of the project by the Regional Office of the Ministry of Environment andForests and SPCB.4. Recent monitoring report from SPCB, which shall include data on AAQ, waterquality, solid waste etc. shall be submitted.5. Has the unit received any notice under the Section 5 of Environment (Protection)Act, 1986 or relevant Sections of Air and Water Acts? If so, compliance to thenotice(s).6. Geo-technical data by a bore hole of upto 40 m. in every One sq. km area suchas ground water level, SPTN values, soil fineness, geology, shear wave velocityetc. for liquefaction studies and to assess future Seismic Hazard and EarthquakeRisk Management in the area and impacts due to land slides.7. Public hearing issues raised and commitments made by the project proponent onthe same should be included separately in EIA/EMP Report in the form of tabularchart.8. Occupational Health & Safety:i. Details of existing Occupational & Safety Hazards. What are the exposurelevels of above mentioned hazards and whether they are within PermissibleExposure level (PEL). If these are not within PEL, what measures the companyhas adopted to keep them within PEL so that health of the workers can bepreserved,ii. Details of exposure specific health status evaluation of worker. If the workers’health is being evaluated by pre designed format, chest x rays, Audiometry,Spirometry, Vision testing (Far & Near vision, colour vision and any otherocular defect) ECG, during pre placement and periodical examinations give thedetails of the same. Details regarding last month analyzed data ofabovementioned parameters as per age, sex, duration of exposure anddepartment wise.iii. Annual report of heath status of workers with special reference to OccupationalHealth and Safety.iv. Plan and fund allocation to ensure the occupational health & safety of allcontracts and sub-contract workers.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!