11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

project will be 56.51 MW, which will be sourced from the Captive Power Plant (40 MW),WHRB (2X9 MW) and AVVNL (Ajmer Vidyut Vitran Nigam Ltd.). Additional D.G Set of 5MW is proposed for emergency.All major sources of air pollution of cement plant will be provided with BagHouses/Bag filters, ESPs to maintain the PM emission level below 50 mg/Nm 3 .Particulate emissions of CPP (WHRB) will be controlled with ESPs to maintain the PMemission level below 100 mg/Nm 3 . All material transfer points will be provided with bagfilters to entrap the emissions at the source itself. Clinker & fly ash will be stored in siloand gypsum in covered yard. Total fresh water requirement is 6,244 KLD (Existing 2,571KLD & Additional 3,673 KLD), which will be met from the ground water, mine sump water& Gambhiri Reservoir. No industrial wastewater will be generated in the Cement Plant.Domestic wastewater generated from Cement Plant/Colony will be treated in the existingSTP. The treated water will be utilized for greenbelt development/horticulture activities.Rain water harvesting is also proposed. No solid waste will be generated in cementmanufacturing process. Fly ash from CPP will be utilized for manufacture of cement.Dust collected from various pollution control equipments will be recycled back to theprocess. STP Sludge will be utilized as manure for green belt development within theplant premises.After detailed deliberations, the Committee prescribed following TORs forundertaking detailed EIA/EMP study:1. Executive summary of the project2. Photographs of the existing and proposed plant area.3. Copies of coal linkage documents4. Compliance to the conditions stipulated in the Environmental Clearance / NOCgranted by the SPCB.5. A certified report of the status of compliance of the conditions stipulated in theenvironmental clearance and Consent to Operate for the ongoing I existingoperation of the project by the Regional Office of the Ministry of Environment andForests and SPCB.6. Recent monitoring report from SPCB, which shall include data on AAQ, waterquality, solid waste etc. shall be submitted.7. Has the unit received any notice under the Section 5 of Environment (Protection)Act, 1986 or relevant Sections of Air and Water Acts? If so, compliance to thenotice(s)8. A line diagram/flow sheet for the process and EMP9. The earlier questionnaire for industry sector should be submitted while submittingEIA/EMP.10. A site location map on Indian map of 1:10, 00,000 scale followed by1:50,000/1:25,000 scale on an A3/A2 sheet with at least next 10 Kms of terrainsi.e. circle of 10 kms and further 10 kms on A3/A2 sheets with properlongitude/latitude/heights with min. 100/200 m. contours should be included. 3-Dview i.e. DEM (Digital Elevation Model) for the area in 10 km radius from theproposal site.11. Present land use should be prepared based on satellite imagery. High-resolutionsatellite image data having 1m-5m spatial resolution like quickbird, Ikonos, IRSP-6 pan sharpened etc. for the 10Km radius area from proposed site. The sameshould be used for land used/land-cover mapping of the area.12. Break up of small, medium and large farmers from whom the land is beingacquired. If small farmers are involved, a detailed R&R plan.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!