These analysis should include trace element and metal studies like Cr (vi) Ni,Fe, As, Pb, Zn, Hg, Se, S etc. Presence of radioactive elements (U, Th etc.).22. Petrography, grain size analysis and Major element analysis of raw materialand soil from project site and raw material should be done on the sameparameters along with analysis for SiO 2 , Al 2 O 3 , MgO, MnO, K 2 O, CaO, FeO,Fe 2 O 3 , P 2 O 5 , H 2 O, CO 2.23. If the rocks, ores, raw material has trace elements their petrography, oremicroscopy, XRD, elemental mapping EPMA, XRF is required to quantify theamount present in it and hence future risk involved while using it andmanagement plan.24. Studies for fly ash, muck disposal, slurry, sludge material and solid wastegenerated should also be included, if the raw materials used has traceelements and a management plan.25. Manufacturing process details for all the cement plant, captive power plantand mine should be included.26. Possibility of installation of WHRB will be explored and details included27. Mass balance for the raw material and products should be included.28. Energy balance data for all the components including proposed power plantshould be incorporated.29. Site-specific micro-meteorological data using temperature, relative humidity,hourly wind speed and direction and rainfall should be collected.30. Sources of secondary emissions, its control and monitoring as per the CPCBguidelines should be included. A full chapter on fugitive emissions and controltechnologies should be provided.31. An action plan to control and monitor secondary fugitive emissions from allthe sources as per the latest permissible limits issued by the Ministry videG.S.R. 414(E) dated 30 th May, 2008.32. Vehicular pollution control and its management plan should be submitted.33. A write up on use of high calorific hazardous wastes from all the sources inkiln and commitment regarding use of hazardous waste should be included.34. Ambient air quality at 8 locations within the study area of 10 km., aerialcoverage from project site with one AAQMS in downwind direction should becarried out.35. The suspended particulate matter present in the ambient air must beanalyzed for the presence of poly-aromatic hydrocarbons (PAH), i.e. Benzenesoluble fraction. Chemical characterization of RSPM and incorporating ofRSPM data.36. Determination of atmospheric inversion level at the project site andassessment of ground level concentration of pollutants from the stackemission based on site-specific meteorological features.37. Air quality modelling for all the plants proposed including mine for specificpollutants needs to be done. APCS for the control of emissions within 50mg/Nm 3 should be included. Cumulative impacts of cement plant, CaptivePower Plant and mines located at a distance of 2.0 km on the ambient airquality shall be assessed.38. Action plan to follow National Ambient Air Quality Emission Standards issuedby the Ministry vide G.S.R. No. 826(E) dated 16 th November, 2009 should beincluded.39. Ambient air quality monitoring along with cumulative impact should beincluded for the day (24 hrs) for maximum GLC along with following :i) Emissions (g/second) with and without the air pollution control measures

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!