11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

chlorine storage area shall be provided alongwith automatic start of the scrubbingsystem.v) Fugitive emissions in the work zone environment, product, raw materials storagearea etc. should be regularly monitored. The emissions should conform to the limitsimposed by APPCB.vi) Total fresh water requirement from Godavari River should not exceed 3800 m 3 /dayand prior permission should be obtained from the concerned Authority.vii) Industrial effluent generation shall not exceed 620 m 3 /day and treated in ETP.Treated effluent shall be recycled/reused within the factory premises. Treatedeffluent shall be collected in the guard pond. Regular water quality monitoring ofguard pond shall be carried out and Water quality of treated effluent shall meet thenorms prescribed by CPCB/APPCB.viii) Process effluent/any wastewater shall not be allowed to mix with storm water. Stormwater drain shall be passed through dedicated guard pond.ix) The company should obtain Authorization for collection, storage and disposal ofhazardous waste under the Hazardous Waste (Management, Handling and Trans-Boundary Movement) Rules, 2008 and amended as on date for management ofHazardous wastes and prior permission from APPCB should be obtained fordisposal of solid / hazardous waste in the TSDF. Measures should be taken forfirefighting facilities in case of emergency.x) Selection of captive TSDF site location as per CPCB/MoEF guidelines shall bestrictly followed. Prior permission shall be obtained from SPCB/CPCB for captiveTSDF.xi) As proposed, green belt shall be developed in 60 acres as per the CPCB guidelinesin consultation with the DFO.xii)Occupational health surveillance of the workers should be done on a regular basisand records maintained as per the Factories Act.xiii) All the commitments made to the public during the Public Hearing/PublicConsultation meeting held on 15 th February, 2011 shall be satisfactorilyimplemented and a separate budget for implementing the same should be allocatedand information submitted to the Ministry’s Regional Office at Bangalore.xiv) At least 5 % of the total cost of the project should be earmarked towards thecorporate social responsibility and item-wise details along with time bound actionplan should be prepared and submitted to the Ministry’s Regional Officeat Bangalore. Implementation of such program should be ensured accordingly in atime bound manner.2.2.14. Grain based Distillery Plant (60 KLPD) alongwith Captive Power Plant (2.5 MW)at parts of 526, 532, 534, 536, 538, 556 & 557, Village Peddavaram, MandalNandigama, District Krishna, Andhra Pradesh by M/s Sudheer Bio ProductsPvt. Ltd. (TOR to EC).The project authoritiesand their consultant (Pioneer Enviro Laboratories &Consultants Pvt. Ltd) gave a detailed presentation on the salient features of the projectand proposed environmental protection measures to be undertaken as per Draft Termsof References (TORs) awarded during the 25 th Meeting of the Expert Appraisal

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!