11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

21. The suspended particulate matter present in the ambient air must be analyzedfor the presence of poly-aromatic hydrocarbons (PAH), i.e. Benzene solublefraction. Chemical characterization of RSPM and incorporating of RSPM data.18. Details of Sulphur balance in the proposed unit.19. Air pollution control measures proposed for the effective control of gaseousemissions within permissible limits.20. Plant-wise air pollution control measures proposed for the control of emissionsfrom all the sources.21. Details of water and air pollution and its mitigation plan.22. An action plan to control and monitor secondary fugitive emissions from all thesources.23. Determination of atmospheric inversion level at the project site and assessmentof ground level concentration of pollutants from the stack emission based onsite-specific meteorological features. Air quality modelling for proposed plant.24. Study of flora and fauna alongwith conservation plan for the biodiversity.25. Permission from the concerned authority for the drawl of 6130 m 3 /hr water fromMahanadi River. Water balance chart including water intake, effluent generated,recycled and reused and discharged is to be provided.26. Action plan to reduce fresh water requirement. Methods adopted/to be adoptedfor the water conservation should be included.27. Design details of the ETP and air pollution control equipments (Bag filters/ wetscrubber etc.). Installation of Continuous TOC analyzer to holding tank beforedischarge of effluent.28. Action plan for Zero Discharge of effluent as proposed should be included.29. Details of phenol recovery unit.30. Odour control management if any.31. Storm water management within plant premises.32. Ground water monitoring minimum at 6 locations should be carried out.Geological features and Geo-hydrological status of the study area andecological status (Terrestrial and Aquatic).33. Note on compliance to the recommendations mentioned in the CREP forpetrochemical industries.34. Detailed ash management including characterization, leachability study, stabilityand suitability for backfilling and alternate use of ash.35. The details of solid and hazardous wastes generation, storage, utilization anddisposal particularly related to the hazardous waste calorific value of hazardouswaste and detailed characteristic of the hazardous waste.36. Precautions to be taken during storage and transportation of hazardouschemicals should be clearly mentioned and incorporated.37. Details of captive land fill alongwith design details as per CPCB guidelines, ifapplicable.38. Details of storage yard for coal, slag, gypsum, ash etc.39. A copy of MoU with various agencies for disposal of slag and fly ash.40. Diversion of forests with impact on ecology.41. An action plan to develop green belt in 33 % area. Layout plan for proposedgreenbelt.42. Action plan for rainwater harvesting measures at plant site should be included toharvest rainwater from the roof tops and storm water drains to recharge theground water.43. Details of existing Occupational & Safety Hazards. What are the exposure levelsof above mentioned hazards and whether they are within Permissible Exposure

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!