11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.7.18. Expansion Plant for the Manufacture of Organic Intermediates at Village Nadod,District Navasi, Gujarat by M/s Yashashvi Rasayan Pvt. Ltd. (TOR).The proponent did not attend the meeting. The Committee decided to considerthe project as and when requested by the proponent.2.7.19. Distillery (30 KLPD), Co-generation Power Plant (22 MW) and Sugar (3500TCD) Manufacturing Unit at Village Belewadi-Kalamma, Tehsil Kagal,District Kolhapur, Maharashtra by M/s Sar Senapti Santaji Ghorpade SugarFactory Ltd. (TOR).The project authorities and their consultant gave a detailed presentation on thesalient features of the project and proposed environmental protection measures to beundertaken alongwith the draft Term of References for the preparation of EIA/EMP.Allmolasses based distilleries are listed at S.N. 5(g) (i) under category ‘A’ and appraised bythe Expert Appraisal Committee in the MoEF.M/s Sar Senapti Santaji Ghorpade Sugar Factory Ltd. has proposed for setting upof distillery (30 KLPD), Co-generation Power Plant (22 MW) and Sugar (3500 TCD)Manufacturing unit at village Belewadi-Kalamma, Tehsil Kagal, District Kolhapur,Maharashtra. No forest land is involved. No court case/litigation are pending against theproject. Plant will be operated for 270 days. Total plot area is 172441.62 m2. Totalproject cost is Rs. 259.72 crores. Proposed distillery will use molasses from own 3500TCD sugar factory (175 days) and outside sugar factories during balance 95 days. RiverChikutra is flowing at a distance of 3 Km. interstate boundary is located 8.3 Km.ESP alongwith stack ht of 85 m will be provided to coal fired boiler. Low Nox burner willbe provided. The water requirement for the distillery and Co-generation will be 360m 3 /day and 2200 m 3 /day respectively. Spent wash will be evaporated followed byincinerated. Domestic effluent will be treated in STP. Fly ash will be sent for brickmanufacturing. Biocompost will be sent to farmer. Bagasse and coal will be used as rawmaterial.After deliberations, the Committee prescribed the following TORs for undertakingdetailed EIA study:1. Executive summary of the project.2. Project proponent should inform CPCB and RSPCB about proposed activity andobtain NOC for the new plant at new location.3. Detailed breakup of the land area alongwith latest photograph of the area.4. Present land use based on satellite imagery.5. Details of site alongwith photographs and information related to environmentalsetting within 10 km radius of the project site.6. Information regarding eco-sensitive area such as national park/wildlife sanctuary/biosphere reserves within 10 km radius of project area.7. List of existing distillery units in the area alongwith their capacity.8. Number of working days of the distillery unit, cogeneration plant and sugar unit.9. Total cost of the project alongwith total capital cost and recurring cost/annum forenvironmental pollution control measures.10. Details of raw material and source of raw material including cereal grains. Availabilityof molasses and calculation for the molasses requirement in the proposedmanufacturing unit.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!