11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5 Alpha Terpeneol & Terpenyl 3000 250acetate6 Nopol & Nopyl Acetate 600 507 Myrcene 600 508 Terpen-4-ol 1200 1009 Terpen Hydrate 1200 10010 Delta- 3-Carene 900 7511 Phenol Terpene Resins 1800 150Total (Products) 21300 1776By products12 Sodium Acetate Trihydrate 5000 41713 Sodium Acetate Anhydrous 1800 15014 Dipentene 6000 50015 Pinetar 4500 37516 Camphor Oil 450 38Total 17750 1480Cyclone and bag filter will be provided to coal/ground nut husk fired boiler (10 TPD).Stack height of 9m will be provided to DG set. Water requirement from ground watersource will be 22.5 m 3 /day. Effluent will be treated in ETP. ETP sludge will be sent toTSDF. Used oil will be sent to register recyclers. Power requirement will be 500 KVA. DGset (450 KVA) will be installed.After detailed deliberations, the Expert Appraisal Committee prescribed thefollowing ToRs for preparation of EIA/EMP:1. Executive summary of the project2. Justification of the project.3. Project location and plant layout.4. Promoters and their back ground.5. Regulatory framework6. A map indicating location of the project and distance from severely polluted area7. Infrastructure facilities including power sources.8. Total cost of the project alongwith total capital cost and recurring cost/annum forenvironmental pollution control measures.9. Project site location alongwith site map of 10 km area and site details providingvarious industries, surface water bodies, forests etc.10. Present land use based on satellite imagery for the study area of 10 km radius.11. Location of National Park/Wild life sanctuary/Reserve Forest within 10 km radiusof the project.12. Details of the total land and break-up of the land use for green belt and otheruses.13. List of products alongwith the production capacities.14. Detailed list of raw material required and source, mode of storage andtransportation.15. Manufacturing process details alongwith the chemical reactions and process flowchart.16. Site-specific micro-meteorological data using temperature, relative humidity,hourly wind speed and direction and rainfall is necessary.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!