11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12. Project site location alongwith photographs of the project site and site map of 10km area and site details providing various industries, surface water bodies,forests etc.13. Present land use based on satellite imagery for the study area of 10 km radius.14. Location of National Park/Wild life sanctuary/Reserve Forest within 10 km radiusof the project.15. Details of the total land and break-up of the land use for green belt and otheruses.16. List of products alongwith the production capacities.17. Detailed list of raw material required and source, mode of storage andtransportation.18. Manufacturing process details alongwith the chemical reactions and process flowchart.19. Site-specific micro-meteorological data using temperature, relative humidity,hourly wind speed and direction and rainfall is necessary.20. Ambient air quality monitoring at 6 locations within the study area of 5 km., aerialcoverage from project site as per NAAQES notified on 16 th September, 2009.Location of one AAQMS in downwind direction.21. One season site-specific micro-meteorological data using temperature, relativehumidity, hourly wind speed and direction and rainfall and AAQ data (exceptmonsoon) for PM 10 , SO 2 , NOx including HC and VOCs should be collected. Themonitoring stations should take into account the pre-dominant wind direction,population zone and sensitive receptors including reserved forests. Data forwater and noise monitoring should also be included.22. Air pollution control measures proposed for the effective control of gaseousemissions within permissible limits.23. Name of all the solvents to be used in the process and details of solvent recoverysystem.24. Design details of ETP, incinerator, if any along with control of Dioxin & Furan,boiler, scrubbers/bag filters etc.25. Details of water and air pollution and its mitigation plan26. Action plan to control ambient air quality as per NAAQES Standards notified bythe Ministry on 16 th September, 2009.27. An action plan to control and monitor secondary fugitive emissions from all thesources.28. Determination of atmospheric inversion level at the project site and assessmentof ground level concentration of pollutants from the stack emission based on sitespecificmeteorological features. Air quality modelling for proposed plant.29. Permission for the drawl of 286 m 3 /day water from the concerned agency. Waterbalance chart including quantity of effluent generated recycled and reused anddischarged.30. Action plan for ‘Zero’ discharge of effluent should be included.31. Ground water quality monitoring minimum at 6 locations should be carried out.Geological features and Geo-hydrological status of the study area and ecologicalstatus (Terrestrial and Aquatic).32. The details of solid and hazardous wastes generation, storage, utilization anddisposal particularly related to the hazardous waste calorific value of hazardouswaste and detailed characteristic of the hazardous waste.33. Precautions to be taken during storage and transportation of hazardouschemicals should be clearly mentioned and incorporated.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!