11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

preparation of EIA/EMP.All Synthetic Organic Chemicals Industry located inside thenotified industrial area/estate are listed at S.N. 5(f) under category ‘B’ and appraised atState level. However, applicability of general condition due to project location withininterstate boundary, proposal is treated as category ‘A’ and appraised at Central Level.M/s Shri Hap Chemicals Enterprises Pvt. Ltd. (Unit –II) has proposed forexpansion of Rubber Processing Chemicals at Plot No. A2/2225, 2226, Phase-III, GIDCVapi, Tehsil Pardi, District Valsad, Gujarat. Plant is located within the 10 Km of Unionterritory boundary i.e. Daman. No forest land is involved. No court case/ litigation ispending against the project. Plot area is 3602.48 m 2 . Total project cost is Rs 2.5 crores.Following products will be manufactured.S.N. Product Quantity (MTPM)Existing Additional After totalproposed proposedexpansion1 Rubber Processing Chemicals such asAccelerators75 350 425Adequated stack height is provided to gas fired boiler. Caustic scrubbing system isprovided to (Chlorination) process vent. Bagfilter is provided to dryer. Cyclone separatorfollowed by bagfilter is provided to grinder. For the proposed expansion, adequate stackheight will be provided to gas fired boiler. Caustic scrubbing system will be provided toprocess vent of chlorination. Ag filter will be provided to dryers. Cyclone separatoralongwith bagfilter will be provided to grinder. Fresh water consumption will be increasedfrom 55 m 3 /day to 286 m 3 /day after expansion. Industrial effluent generation will be 180m 3 /day and treated in ETP. Treated water will be discharged to CETP for furthertreatment and them to sea. ETP waste will be sent to TSDF. Used oil will be sent toauthorized recyclers/ re-processors. Power requirement will be 3000 KVA from GEB.Coal will be used as fuel.After detailed deliberations, the Expert Appraisal Committee prescribed thefollowing ToRs for preparation of EIA/EMP:1. Executive summary of the project2. Justification of the project.3. Project location and plant layout.4. Promoters and their back ground.5. Regulatory framework6. Environment clearance for the existing unit issued by the Ministry (reasons, if notobtained), Consent to Operate and Authorization accorded by the GPCB.7. Data for the stack emissions, fugitive emissions; water requirement and waterbalance chart; wastewater generation, treated effluent quality, re-utilization anddisposal of solid/hazardous waste for the existing unit.8. A map indicating location of the project and distance from severely polluted area9. A copy of Gazette Notification issued by the Govt. of Gujarat indicating locationof the project in notified GIDC should be included necessarily.10. Infrastructure facilities including power sources.11. Total cost of the project alongwith total capital cost and recurring cost/annum forenvironmental pollution control measures.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!