11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

12. Location of National Park/Wild life sanctuary/Reserve Forest within 10 km radiusof the project.13. Details of the total land and break-up of the land use for greenbelt and otheruses.14. List of products alongwith the production capacities.15. Detailed list of raw material required and source, mode of storage andtransportation.16. Manufacturing process details alongwith the chemical reactions and process flowchart.17. Site-specific micro-meteorological data using temperature, relative humidity,hourly wind speed and direction and rainfall is necessary.18. Ambient air quality monitoring at 6 locations within the study area of 5 km., aerialcoverage from project site as per NAAQES notified on 16 th September, 2009.Location of two AAQMS in downwind direction.19. One season site-specific micro-meteorological data using temperature, relativehumidity, hourly wind speed and direction and rainfall and AAQ data (exceptmonsoon) for PM 10 , SO 2 , NOx including VOCs should be collected. Themonitoring stations should take into account the pre-dominant wind direction,population zone and sensitive receptors including reserved forests. Data forwater and noise monitoring should also be included.20. Air pollution control measures proposed for the effective control of gaseousemissions within permissible limits.21. Name of all the solvents to be used in the process and details of solvent recoverysystem.22. Design details of ETP, incinerator, if any alongwith boiler, scrubbers/bag filtersetc.23. Details of water and air pollution and its mitigation plan24. Action plan to control ambient air quality as per NAAQES Standards notified bythe Ministry on 16 th September, 2009.25. An action plan to control and monitor secondary fugitive emissions from all thesources.26. Determination of atmospheric inversion level at the project site and assessmentof ground level concentration of pollutants from the stack emission based on sitespecificmeteorological features. Air quality modelling for proposed plant.27. Permission for the drawl of 153.25 m3/dayground water from the CGWA/SGWA.Water balance chart including quantity of effluent generated recycled and reusedand discharged.28. Action plan for Zero Discharge of effluent should be included.29. Ground water quality monitoring minimum at 6 locations should be carried out.30. The details of solid and hazardous wastes generation, storage, utilization anddisposal particularly related to the hazardous waste calorific value of hazardous

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!