11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the project. Total plot area is 1,02,945 m 2 . River Mahi is flowing at a distance of 7 Km.Following products will be manufactured:S.N. Products Capacity (MTPA)A STYRENE BUTYL ACRYLATE CO‐POLYMER 13,200TONERB CO‐POLYMERS SOLIDS (RESINS)1. Styrene Butyl Acrylate2. Styrene Methyl Acrylate3. Styrene Ethyl Acrylate4. Styrene Isobutyl Acrylate5. Styrene Ethyl Hexyl Acrylate6. Styrene Methyl Methacrylate7. Styrene Ethyl Methacrylate8. Styrene Butyl Methacrylate9. Styrene Isobutyl Methacrylate10. Styrene Lauryl Methacrylate11. Styrene Stearyl Methacrylate9900There will be emissions from boiler and process vents. Total water requirement fromground water source will be 153.25 m3/day. Effluent generation will be 68.5 m3/day andtreated in ETP. Treated water will be recycled/reused within the factory premises. ETPsludge and filter cake from evaporator wil be sent to TSDF site. Used oil will be sentauthorized recyclers/reprocessors. Greenbelt will be developed in 33972 m 2 out of totalland 1,02,945 m 2 . Power requirement will be 490 KVA and sourced from MGVCL. DGset (1x625 KVA) will be installed for emergency power back up. Agro waste (1.25 TPD),HSD (120 LPH) will be used as fuel.After detailed deliberations, the Expert Appraisal Committee prescribed the followingTORs for preparation of EIA/EMP:1. Recommendation on project proposal from Gujarat Pollution Control Board to besubmitted alongwith the EIA report.2. Executive summary of the project3. Justification of the project.4. Promoters and their back ground.5. Regulatory framework6. A map indicating location of the project and distance from severely polluted area.7. Project location and plant layout.8. Infrastructure facilities including power sources.9. Total cost of the project alongwith total capital cost and recurring cost/annum forenvironmental pollution control measures.10. Project site location alongwith photgraphs of the project area site map of 10 kmarea and site details providing various industries, surface water bodies, forestsetc.11. Present land use based on satellite imagery for the study area of 10 km radius.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!