11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

29. Ground water quality monitoring minimum at 6 locations should be carried out.Geological features and Geo-hydrological status of the study area and ecologicalstatus (Terrestrial and Aquatic).30. The details of solid and hazardous wastes generation, storage, utilization anddisposal particularly related to the hazardous waste calorific value of hazardouswaste and detailed characteristic of the hazardous waste. Action plan for themanagement of fly ash generated from boiler should be included.31. Precautions to be taken during storage and transportation of hazardouschemicals should be clearly mentioned and incorporated.32. A copy of the Memorandum of Understanding signed with cement manufacturersindicating clearly that they will utilized all the organic solid waste generated.33. A copy of ‘Memorandum of Understanding’ (MoU) signed with coal supplier forimported coal.34. Authorization/Membership for the disposal of liquid effluent in CETP andsolid/hazardous waste in TSDF.35. Risk assessment for storage for chemicals/solvents.36. Material safety data sheet to be submitted.37. An action plan to develop green belt in 33 % area. Layout map indicatinggreenbelt to be submitted.38. Action plan for rainwater harvesting measures at plant site should be included toharvest rainwater from the roof tops and storm water drains to recharge theground water.53. Details of occupational health programme.i) To which chemicals, workers are exposed directly or indirectly.ii) Whether these chemicals are within Thresh Limit Values (TLV)/ PermissibleExposure Levels as per ACGIH recommendation.iii) What measures company have taken to keep these chemicals withinPEL/TLV.iv) How the workers are evaluated concerning their exposure to chemicalsduring pre-placement and periodical medical monitoring.v) What are onsite and offsite emergency plan during chemical disaster.vi) Liver function tests (LFT) during pre-placement and periodical examination.51. Details of occupational health surveillance programme.52. Socio-economic development activities shall be in place.53. Note on compliance to the recommendations mentioned in the CREP guidelines.54. Detailed Environment management Plan (EMP) with specific reference to detailsof air pollution control system, water & wastewater management, monitoringfrequency, responsibility and time bound implementation plan for mitigationmeasure shall be provided.55. EMP shall include the concept of waste-minimization, recycle / reuse / recovertechniques, Energy conservation, and natural resource conservation.56. Total capital cost and recurring cost/annum for environmental pollution controlmeasures.57. Corporate Environmental Responsibility(a) Does the company have a well laid down Environment Policy approved by itsBoard of Directors? If so, it may be detailed in the EIA report.(b) Does the Environmental Policy prescribe for standard operatingprocess/procedures to bring into focus any infringement / deviation / violation of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!