11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11 Ethyl acetate (recover) 51612 Phthalic acid 16013 Methanol (recover) 65014 Polyethylene glycol 400 18015 Methylene di chloride (MDC ) Recovered 69016 Ethanol (recovered) 85517 Methyl teriary butyl ether MTBE (recovered) 12518 Ethylene di chloride EDC (recovered) 38019 Acetone (recovered) 27520 Methyl isobutyl ketone MIBK (recovered) 13521 Toluene (recovered) 41022 Tetrahydrofuran (recovered) 31023 Methylacetoacetate (recovered) 9624 Pet. Ether (recovered) 78425 Tertiary butanol (recovered) 30926 Potassium chloride (recovered) 12527 Tri ethyl amine HCl (recovered) 62028 N-methylpyrrolidone NMP (recovered) 71029 N,N-Dimethyl Aniline HCl (recovered) 17030 Ortho dichloro benzene ODCB (recovered) 29531 Dimethylsulphoxide DMSO (recovered) 105032 2,5-Norbornadine NBD (recovered) 21433 Xylene (recovered) 98034 Ethylene glycol dimethyl ether (recovered) 67535 HCl gas (recovered) 58736 Sodium bi sulphite (recovered) Soln. 20-25 % 22537 Sodium Formate 900Total 18,924Adequate stack height will be provided to gas fired boiler, thermopack, CPP-1,CPP-2 and CPP-3, Water scrubber followed by alkali scrubber will be provided toprocess vent-1 to control HCl. Alklai scrubber will be provided to process vent-II tocontrol SO 2 . Total water requirement is 2350 m3/day and sourced from GIDC watersupply. Industrial effluent generation is 855 m 3 /day. Effluent will be segregated into highTDS and low TDS. High TDS effluent will be treated in MEE. Low TDS will be treated inETP and treated effluent will be sent to deep sea through GIDC drain. Process wasteand distillation residue will be sent to common incineration facility. ETP sludge andincineration ash will be sent to TSDF. Used oil will be sent to recyclers. Iron waste will besent to TSDF/actual users of cement Industries. DG set-I (1500 KVA) and DG set II(1500 KVA) will be installed. Power requirement will be 7 MW and met from GEB. CPP(3 x 1.3 MW) and 2.5 MW turbine will be installed. DG set (2x1500 KVA) will be installed.Natural gas (3500 m3/day), diesel (50 KLPM and furnace oil (50 KLPM) will be used asfuel. Greenbelt will be developed in 52800 m 2 .After detailed deliberations, the Expert Appraisal Committee prescribed thefollowing TORs for preparation of EIA/EMP:1. Executive summary of the project2. Justification of the project.3. Promoters and their back ground.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!