38. Action plan for rainwater harvesting measures at plant site should be included toharvest rainwater from the roof tops and storm water drains to recharge theground water.39. Details of occupational health surveillance programme.40. Details of socio-economic welfare activities.41. Traffic study of the area for the proposed projects in respect of existing traffic,type of vehicles, frequency of vehicles for transportation of materials, additionaltraffic due to proposed project, parking arrangement etc.42. Action plan for post-project environmental monitoring.43. Any litigation pending against the project and /or any direction /order passed byany Court of Law against the project, if so, details thereof.44. Public hearing issues raised and commitments made by the project proponent onthe same should be included separately in EIA/EMP Report in the form of tabularchart with financial budget for complying with the commitments made.45. A tabular chart with index for point-wise compliance of above TORs.The following general points should be noted:i. All documents should be properly indexed, page numbered.ii. Period/date of data collection should be clearly indicated.iii. Authenticated English translation of all material provided in Regional languages.iv. The letter/application for EC should quote the MOEF file No. and also attach acopy of the letter.v. The copy of the letter received from the Ministry should be also attached as anannexure to the final EIA-EMP Report.vi. The final EIA-EMP report submitted to the Ministry must incorporate the issues inthis letter and that raised in Public Hearing/consultation alongwith duly filled inIndustry Sector questionnaire. The index of the final EIA-EMP report mustindicate the specific chapter and page no. of the EIA-EMP Report where theabove issues and the issues raised in the Public hearing have been incorporated.vii. While preparing the EIA report, the instructions for the proponents andinstructions for the consultants issued by MoEF vide O.M. No. J-11013/41/2006-IA.II (I) dated 4 th August, 2009, which are available on the website of this Ministryshould also be followed.The Committee decided that the proponent should prepare EIA/EMPReport based on the above TORs and submit the same to the Haryana State PollutionControl Board for conducting public hearing/consultation. The EIA/EMP Report shouldbe as per the generic structure given in Appendix-III of EIA Notification, 2006. Theconcerns emerged during the Public Hearing/ Consultation should be incorporated in theEIA/EMP Report and the final EIA/EMP submitted to the Ministry for obtainingenvironmental clearance.2.7.11. Speciality Chemicals and Agrochimcal Intermediates Manufacturing Unit andCPP (3.9 MW) & Turbine (2.5 MW) at Plot No. CH-2, Dahej Industrial Estate,Village Dahej, Distt Bharuch, Gujarat by M/s Agrasen Impex Pvt. Ltd. (TOR).The project authorities and their consultant (Eco-Chem Sales & Services) gave adetailed presentation on the salient features of the project and proposed environmentalprotection measures to be undertaken alongwith the draft Term of References for the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!